Similar Projects
US0290 - Bridge Deck Repair
Post-Bid
$296,080 est. value
TX

Oil Dock #6 East Side Pipe Bridge
Post-Bid
Brownsville, TX

FM 365 - Bridge Replacement
New Construction
Results
$1,529,535 est. value
TX

IH 20 - Bridge Maintenance
New Construction
Results
$699,253 est. value
TX

Bridge on Kulow Road and Sealy Road
New Construction, Infrastructure
Post-Bid
Peters, Sealy, TX 77474

City Course Bridge Replacement at Hole 18
New Construction, Infrastructure
Results
$149,140 est. value
Bryan, TX 77802

William Cannon Drive Phase 3
Infrastructure
Post-Bid
$370,000 CJ est. value
Austin, TX 78745

Removal of Existing Materials and Construction of 'Low Water Crossing'
Infrastructure
Results
TX

Z--MATOC - IMR Bridges
New Construction
Post-Bid
$10,000,000 est. value

FM 116 - Construct Overpass/Underpass
New Construction, Infrastructure
Results
$12,423,652 est. value
TX

Camp Twin Lake Pedestrian Bridge
New Construction, Infrastructure
Results
$530,000 est. value
TX

FM 707 - Bridge Replacement
New Construction, Infrastructure
Results
$1,759,299 est. value
TX

2022 Bridge Rehabilitation Contract 2
Infrastructure
Results
Fort Worth, TX

IH 20 - Bridge Maintenance
New Construction, Infrastructure
Results
$7,585,027 est. value
TX

CS - Bridge Replacement
New Construction, Infrastructure
Results
$892,267 est. value
TX

Last Updated 06/28/2023 05:03 PM
Project Title

Bridge Replacement - CR

Physical Address View project details and contacts
City, State (County) Roby, TX 79543   (Fisher County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $917,198 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For Ps&e Package Questions Call: Tracy Jones 4250 North Clack Abilene, Tx 79601 325/676-6825 For Questions Regarding a Proposal Call 512/416-2498 Length: 0 Mi Time for Completion: 96 Working Days TXDOT -Bridge Replacement - CR

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents