Similar Projects
Reclamation of County Roads
Term Contract
Post-Bid
Kingston, NY

Guide Rail Materials, New & Used
Post-Bid
NY

Access Road Rehabilitation - Phase 3 at Minnewaska State Park Preserve
Results
$2,295,000 to $3,105,000 est. value
Kerhonkson, NY 12446

1928 HAB North Steps and Ramp Railings
Results
New Paltz, NY 12561

City of Kingston Pedestrian Safety Action Plan
Term Contract
Post-Bid
NY

Floodwall Repairs - Ellenville
Results
$250,000 to $500,000 est. value
Ellenville, NY

Warner Creek at WC-1 & Wc-2 River Restoration Project
Post-Bid
Chichester, NY 12416

Cured-In-Place Pipelining - Term Construction Contract 7
Results

Block Park Parking Lot Paving Project
Post-Bid
$700,000 est. value
Kingston, NY 12401

Culvert Job Order Contract: NYSDOT Region 8
Results
$1,200,000 est. value

Painting of Stop Bars and Symbols
Term Contract
Post-Bid
NY

Replace Various Culverts on Route 44/55 and 17K
Results
$1,300,000 est. value
Crawford, Gardiner, NY

Watson Hollow Precast Concrete Culvert
Term Contract
Post-Bid
NY

New York Rising, Governor's Office of Storm Recovery (GOSR), Village of Ellenville/Town of Wawarsing, Stream Restoration Project
Results
Ellenville, NY

Replacement of Burgher Road Culvert over Dry Brook
Infrastructure
Post-Bid
West Shokan, NY 12494

Last Updated 05/02/2022 02:22 PM
Project Title

Tillson Avenue: Route 44/55(Vineyard Avenue) to Route 9w

Physical Address View project details and contacts
City, State (County) Highland, NY 12528   (Ulster County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Owner is the Town of Lloyd and the work site is/are located in the Hamlet of Highland, Town of Lloyd. The projects limits extend approximately from the intersection of Tillson Avenue, Toc Drive, and Route 44/55 (Vineyard Avenue) to the intersection of Tillson Avenue and Route 9W. The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including, but not necessarily limited to the following: full depth pavement reconstruction, a new three-sided culvert over the Twaalfskill Creek, curb, sidewalk, closed drainage, retaining walls, and pavement milling and overlay. Additional work includes sidewalk ramps, landscaping, signing, striping, and site restoration along Tillson Avenue, Toc Drive, and Route 44/55 (Vineyard Avenue) in the Town of Lloyd.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 10 - Specialties, Signage.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving Rehabilitation, Cold Milling Asphalt Paving, Rigid Paving Rehabilitation, Milling of Concrete Paving, Concrete Overlays, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Retaining Walls, Planting Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents