Similar Projects
Needlepoint Bipolar Ionization
Bidding
Charlotte, NC

PC Air Units
Post-Bid
Charlotte, NC 28208

Replace HVAC Equipment/Systems - Charlotte
Post-Bid
$1,000,000 to $5,000,000 est. value
Charlotte, NC

HVAC Parts and Equipment
Results
Charlotte, NC

Charlotte North Carolina HVAC Replacement
Results
$120,000 to $170,000 est. value
Charlotte, NC

HVAC Replacements at Wilson Air North
Post-Bid
Charlotte, NC 28208

CATS North Tryon Underpass and Old Concord Road HVAC Addition for Remote Ethernet Switch Cabinets
Results
Less than $25,000 est. value
Charlotte, NC 28273

Weddington Elementary School's Chiller Replacement
Post-Bid
Matthews, NC 28104

Cats NTUP and OCR P and R HVAC Addition for RES Cabinets
Results
Less than $25,000 est. value
Charlotte, NC 28200

HVAC Preventative Maintenance and Repair Services
Term Contract
Post-Bid
Charlotte, NC 28277

HVAC Replacements at Honeywell Building
Results
Charlotte, NC

Replacement of Seven (7) Roof Top Air-Conditioning Units at JV Washam Elementary School
Post-Bid
Cornelius, NC 28031

Replacement of Unit Ventilators at South Charlotte Middle School
Results
Charlotte, NC 28277

Needle Point Bipolar Ionizers
Post-Bid
Charlotte, NC

Grady Cole-Electrical Modifications and HVAC Replacement Project
Results
Charlotte, NC

Reported 10/09/2020 09:55 AM
Project Title

McEniry HVAC and IT Infrastructure Upgrades

Physical Address View project details and contacts
City, State (County) Charlotte, NC 28223   (Mecklenburg County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method
Project Status Construction Commenced September 2020
Bids Due View project details and contacts
Estimated Value $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SPECIFIC TRADE PACKAGES - BP 01A General Trades (Carpentry, Masonry, Temp Construction, Cleaning, etc.), BP 02A Demolition & Asbestos Abatement, BP 09A Gypsum Wall Board Assemblies, BP 09B Hard Tile, BP 09C Acoustical Ceilings, BP 09D Flooring (Carpet & resilient), BP 09E Painting, BP 21A Fire Protection, BP 23C Mechanical (HVAC & Controls), BP 26A Electrical, and BP 27A Communications Demolition of existing ceilings, in order to complete the HVAC and IT infrastructure upgrades, as well as existing flooring, which includes Asbestos-Containing Materials. Architectural work includes new ACT and drywall ceilings, new flooring, and painting.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 09 - Finishes.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents