Similar Projects
Screening Garage Odor Control Unit - City of Nashua
Renovation
Conception
$500,000 est. value
Nashua, NH 03060

Canal/Franklin/Main Street Intersection Improvements - City of Nashua
Infrastructure
Conception
Nashua, NH

74 Main Street Mixed Use Building
Demolition, New Construction, Infrastructure - 31,000 SF
Design
$4,000,000 CJ est. value
Durham, NH 03824

Thomas More College of Liberal Arts Campus Improvements
Renovation
Design
Merrimack, NH 03054

Seabrook Seawall Repair Project
Infrastructure
Bidding
$60,000 CJ est. value
Seabrook, NH 03874

Islington Street Corridor Improvements - Phase 2
Infrastructure
Bidding
$500,000 CJ est. value
Portsmouth, NH 03801

The Notch Climbing Gym
New Construction, Infrastructure - 12,250 SF
Sub-Bidding
$3,000,000 CJ est. value
Lebanon, NH 03766

Construction Services for North Jetty Repairs in Hampton
Infrastructure
Post-Bid
$4,313,500 CJ est. value
Hampton, NH 03842

Installation of a Fiberglass, Thirty-thousand-gallon Cistern
Infrastructure
Post-Bid
$125,000 CJ est. value
Epping, NH 03042

Upgrading the Existing Secondary Clarifiers and Covers at the Milford Wastewater Treatment Facility (WWTF)
Results
Milford, NH 03055

Waste Water Treatment Facility Phase III Upgrade
Results
Less than $16,780,000 est. value
Merrimack, NH

Sitework for 2 Retail Buildings
New Construction - 11,225 SF
Construction
Epping, NH 03042

Keene Housing Site Improvements - Multiple Locations
Renovation
Construction
Keene, NH

McCrone Place
New Construction, Infrastructure - 23,000 SF
Pending Verification
$25,000,000 CJ est. value
Dover, NH 03820

Aroma Joes / Hudson
New Construction, Infrastructure - 900 SF
Pending Verification
$270,000 CJ est. value
Hudson, NH 03051

Last Updated 09/23/2022 01:35 AM
Project Title

Wastewater Treatment Plant - Town of Wakefield

Physical Address View project details and contacts
City, State (County) Wakefield, NH 03872   (Carroll County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2024
Bids Due View project details and contacts
Estimated Value $1,120,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Town operates an open lagoon and holding tank system for its wastewater. We are 1 of 2 towns in the state currently doing so. It will be required that the Town develop a long-term strategy to handle wastewater from the community. Costs and funding are unknown at this time. But it will be important for the community to begin setting aside Capital Reserves for the engineering and development of this project. Engineering cost estimates are $120,000. Once engineering is completed, cost for the Treatment Plant can be determined. This project is included in the city's 2023-2027 Capital Improvement Plan (CIP). As of September 23, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents