Similar Projects
Rolling Hills New Building Facilities
New Construction
Conception
$42,000,000 est. value
Byesville, OH

2021 Bond Construction & Renovation Projects
New Construction, Renovation
Conception
Northfield, OH

6-8 Middle School
New Construction - 205,000 SF
Design
$98,000,000 est. value
Milford, OH 45150

Amphitheater Construction
New Construction, Infrastructure
Design
Cadiz, OH 43907

Repairs and Improvements to Massillon Washington High School - Massillon City School District Administration
Renovation
Bidding
$4,300,000 CJ est. value
Massillon, OH 44646

RFP Design - General Capital Improvements
Renovation
Bidding
$5,000,000 CJ est. value
Brecksville, OH 44141

Brookfield K-12 Repair Project
Renovation
Post-Bid
$2,300,000 CJ est. value
Brookfield, OH 44403

Grand River Shooting Range Improvements and Outdoor Education Center
Renovation - 12,200 SF
Post-Bid
$8,000,000 CJ est. value
West Farmington, OH 44491

Pre-K-12 School
Renovation, Addition - 224,147 SF
Results
$51,458,378 est. value
Byesville, OH 43723

Construction Management Services - Career and Technology Education Addition at Crenshaw Middle School
Addition
Results
Canton, OH 44705

Renovations to 6924 Spring Valley - Rebid
Renovation
Construction
$2,300,000 CJ est. value
Holland, OH 43528

The Learning Experience
New Construction - 10,073 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Pickerington, OH 43147

Manchester Local New High School - Manchester Local School District Facility
New Construction, Infrastructure - 81,361 SF
Pending Verification
$27,204,629 CJ est. value
Manchester, OH 45144

Zora's House
New Construction, Infrastructure - 10,000 SF
Pending Verification
$3,500,000 CJ est. value
Columbus, OH 43201

The Learning Experience
New Construction - 14,800 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Westerville, OH 43082

Last Updated 07/20/2023 04:40 PM
Project Title

Early Childhood Renovation

Physical Address View project details and contacts
City, State (County) Cincinnati, OH 45218   (Hamilton County)
Category(s) Education
Sub-Category(s) Middle/Senior High School, Pre-School/Daycare
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $3,900,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Architect will issue a detailed description of proposed changes in the Work that may require adjustment to the Contract Sum or the Contract Time. If necessary, the description will include supplemental or revised Drawings and Specifications. 1. Work Change Proposal Requests issued by Architect are not instructions either to stop work in progress or to execute the proposed change. 2. Within time specified in Proposal Request after receipt of Proposal Request, submit a quotation estimating cost adjustments to the Contract Sum and the Contract Time necessary to execute the change. a. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities. b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts. It is understood and agreed that each Bid Package will achieve Substantial Completion by June 15, 2024 and Final Completion by July 15, 2024, c. Include costs of labor and supervision directly attributable to the change. d. Include an updated Contractor's construction schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time. e. Quotation Form: Use forms acceptable to Architect The probable construction cost estimate for this work is: $3,900,000 base bid

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents