Similar Projects
Parkview Gardens IV
New Construction, Infrastructure
Conception
$19,000,000 CJ est. value
Caledonia, WI 53108

Brighton Dale Sewer Main - Parks-13 - Kenosha County
Infrastructure
Conception
$300,000 CJ est. value
Kansasville, WI 53139

Case High School 2020 Bond - Racine Unified School District
Build-out, Infrastructure
Design
$31,268,754 CJ est. value
Racine, WI 53403

Case High School 2020 Bond - Racine Unified School District
Build-out, Infrastructure
Design
$31,268,754 CJ est. value
Racine, WI 53403

Construct Unit Storage Building- GPC
New Construction, Infrastructure
Bidding
$342,100 CJ est. value
Racine, WI 53403

Fairview Estates Pavement Maintenance
Infrastructure
Bidding
$900,000 CJ est. value
Waterford, WI 53185

Shared Operations Facility - GPC
New Construction, Infrastructure
Post-Bid
$1,576,300 CJ est. value
Kansasville, WI 53139

Caledonia Public Safety Building
New Construction, Infrastructure - 50,000 SF
Post-Bid
$606,000 CJ est. value
Racine, WI 53403

Ten Club Park
New Construction
Results
$3,590,780 est. value
Waterford, WI 53185

Lift Station Nos. 1, 2, 3 and 4 Improvements
Demolition, New Construction, Infrastructure
Results
$3,986,000 CJ est. value
Dover, WI 53139

Buildings 1 and 2 of the Waterford Lofts Project
New Construction, Infrastructure
Construction
$11,000,000 CJ est. value
Waterford, WI 53185

W. 6th Street, Bridge Over Root River, P-51-0709
Infrastructure
Construction
$6,734,483 CJ est. value
Racine, WI 53404

Washington Avenue Multi-Family
Demolition, New Construction, Infrastructure
Pending Verification
$37,000,000 CJ est. value
Racine, WI 53403

North Beach Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Racine, WI 53402

Highway 20 Water Main - West Boulevard to Marquette (Department Of Transportation) - City of Racine
Infrastructure
Conception
$1,000,000 CJ est. value
Racine, WI 53403

Last Updated 07/11/2023 05:04 PM
Project Title

Roofing, Soffits, Fascia, and Other Improvements At the Whitford Park Pavilion Village of Waterford

Physical Address View project details and contacts
City, State (County) Waterford, WI 53185   (Racine County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $35,021 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This Request for Proposal ("RFP") is issued by the Village of Waterford (the "Village"). The purpose of this RFP is to contract with a qualified contractor (the "Contractor") to provide services for the removal and installation of a new shingled roof, Replacing soffit and fascia, new siding material on the south end of the building, and Adding a new soffit and Ceiling System in the open section of the pavilion, ("Project"), in accordance with the terms, conditions, and requirements set forth in this Request for Proposal (the "RFP"). Award of contract no later than June 27,2023 It is the Village's intent to enter into a contract with a Contractor who best demonstrates the ability to provide removal and installation services as described. After review of the proposals, if the Village decides it is not in the best interest to enter into a contract, the Village will notify all Contractors. For the purposes of this RFP, the selected Contractor will be required to work directly with the Village to accomplish the following design requirements: 1. Remove existing roofing, Village to provide dumpster. inspect the condition of existing roof sheathing and framing. Clean up the jobsite daily. 2. Install 6 ft of Owens corning warranty approved ice and water shield, and around all roof protrusions as needed, and along gutters edge as needed. 3. Install new color matched metal drip edge, and gutter apron over the Ice and water shield, install new leaded soil stack covers and a new ridge vent system along the main peak. 4. Install a Owens Corning warranty approved synthetic underlayment and Owens Corning Trudefinition Duration lifetime shingle to color match (Estate Grey) the nearby bathroom building. 5. Install all new trim, facia and soffit in prefinished LP cedar textured boards on the entire building.Vent all soffits as required. Add 2x4 framing as needed to support the soffits. Color to be determined and approved by the village. 6. The interior of the Ceiling in the outdoor pavilion area to be covered with Pro-Rib steel panels. Add 2x4 framing as needed to support the ceiling. 7. Add new LP smart side textured smart siding panels and trim to the south gable end 8. Bidders must do an onsite inspection, measurements, as well as an onsite meeting. Please contact Mike for scheduling. (Contact information in Section 1.02). 9. Obtain all necessary permits. Inspection period for the Pavilion May 10, 2023-June 7 Please contact Mike for scheduling We are requiring each bidder to inspect and measure and meet at the job site before submitting the proposal. Contact Mike Sponholtz, Parks and Facilities Supervisor to schedule the inspection For the purposes of this RFP, the selected Contractor will be required to work directly with the Village to accomplish the following design requirements: 1. Remove existing roofing, Village to provide dumpster. inspect the condition of existing roof sheathing and framing. Clean up the jobsite daily. 2. Install 6 ft of Owens corning warranty approved ice and water shield, and around all roof protrusions as needed, and along gutters edge as needed. 3. Install new color matched metal drip edge, and gutter apron over the Ice and water shield, install new leaded soil stack covers and a new ridge vent system along the main peak. 4. Install a Owens Corning warranty approved synthetic underlayment and Owens Corning Trudefinition Duration lifetime shingle to color match (Estate Grey) the nearby bathroom building. 5. Install all new trim, facia and soffit in prefinished LP cedar textured boards on the entire building.Vent all soffits as required. Add 2x4 framing as needed to support the soffits. Color to be determined and approved by the village. 6. The interior of the Ceiling in the outdoor pavilion area to be covered with Pro-Rib steel panels. Add 2x4 framing as needed to support the ceiling. 7. Add new LP smart side textured smart siding panels and trim to the south gable end 8. Bidders must do an onsite inspection, measurements, as well as an onsite meeting. Please contact Mike for scheduling. (Contact information in Section 1.02). 9. Obtain all necessary permits.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents