Similar Projects
Ivanhoe Apartments
New Construction
Conception
Viera, FL 32940

Retreat at Cocoa Commons
New Construction
Conception
Cocoa, FL

Cocoa Beach Mixed-Use Development
New Construction - 6,000 SF
Design
Cocoa Beach, FL 32931

Saint Stephen's Way Affordable Housing
New Construction
Design
Melbourne, FL 32901

Parking Garage Luminaires
Addition, Alteration
Bidding
Orlando, FL

The Horizon at Sand Pointe - Phase 1
New Construction - 279,106 SF
Post-Bid
Titusville, FL 32780

The Horizon at Sand Pointe - Phase 1
New Construction - 279,106 SF
Post-Bid
Titusville, FL 32780

San Filippo Apartments
New Construction - 258,562 SF
Construction
Palm Bay, FL 32909

San Filippo Apartments
New Construction - 258,562 SF
Construction
Palm Bay, FL 32909

Luna
New Construction - 424,000 SF
Pending Verification
$57,000,000 est. value
Viera, FL

Luna
New Construction - 424,000 SF
Pending Verification
$57,000,000 est. value
Viera, FL

Lion Gardens Apartments
New Construction
Conception
Orlando, FL

Space Coast Town Centre Master Plan
New Construction
Design
West Melbourne, FL

Quail Ridge Apartments
New Construction - 48,667 SF
Post-Bid
Cocoa, FL 32926

Riverwalk Apartments
New Construction
Construction
$39,900,000 est. value
Titusville, FL 32780

Last Updated 03/07/2022 12:18 PM
Project Title

Integra Station at Space Coast Town Centre Apartments

Physical Address View project details and contacts
City, State (County) West Melbourne, FL 32904   (Brevard County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Parking Garage
Contracting Method
Project Status Construction Commenced September 2021, Construction Completion Expected second quarter 2022
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Building 1: 4-story, 17,431 sf. Building 2: 4-story, 12,729 sf. Building 3: 4-story, 19,331 sf Building 4: 4-story, 12,729 sf. Building 5: 4-story, 17,431 sf. Building 6: 4-story, 12,729 sf. Building 7A: 1695 sf, 4-car garage. Building 7B: 1695 sf, 4-car garage.

Details

1,227,500 SF - 11 Apartments/Condominiums, 4 Stories Above Grade, 110,765 SF New Construction 300 Unit(s), New Construction, 556 Parking Spaces, 1 Clubhouse/Social Club, 1 Story Above Grade, 9,085 SF New Construction, Parking Garage.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 14 - Conveying Equipment, Elevators, Elevator Equipment and Controls.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents