Similar Projects
Emergency Restoration Services
Term Contract, Alteration
Bidding
MI

Comstock Middle School Hvac Improvements - Bid Package 1: Equipment Procurement
Alteration
Bidding
Kalamazoo, MI 49048

Fire Exhaust Fans
Post-Bid
Taylor, MI

HVAC Material
Post-Bid
Detroit, MI 48226

Envision Center HVAC, Improvement/Accessibility Modifications
Results
Inkster, MI

Heating, Ventilation, and Air Conditiong (HVAC) Building and Mechanical Systems Inspection, Repair, and Preventative Maintenance Services
Results
$1,000,000 est. value
Detroit, MI

District-Wide Vertical Unit Ventilators
Post-Bid
Westland, MI 48185

Alumni House Chiller
Results
Detroit, MI 48202

HVAC at Davison Annex
Post-Bid
Detroit, MI

Greenhouse Heating and Light Installation
Results
Detroit, MI 48202

Henry Ford Dust Collection
Post-Bid
Detroit, MI 48219

RTU Replacement- Rawsonville and Edgemont
Results
Belleville, MI 48111

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC Revisions at White
Results
Detroit, MI

Air Conditioning Addition and Chiller Replacement
Post-Bid
Grosse Ile, MI 48138

Reported 11/30/2021 12:00 AM
Project Title

BP 2 Allen Park High School and Middle School AC Install

Physical Address View project details and contacts
City, State (County) Allen Park, MI 48101   (Wayne County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents