Similar Projects
Outdoor Seating
New Construction, Alteration
Bidding
Prestonsburg, KY

New Middle School
New Construction
Bidding
$38,000,000 est. value
Lexington, KY 40509

Corbin Middle School Concessions / Restrooms
Post-Bid
$215,000 est. value
Corbin, KY 40701

Corbin High School Career Center - Phase 1
Post-Bid
Less than $2,500,000 est. value
Corbin, KY 40701

Concession / Restroom Addition
Addition
Results
Less than $275,000 est. value
Brooksville, KY

Disaster Recovery Services
Results

Boone County High School Addition and Renovations
Renovation, Addition - 18,573 SF
Construction
Less than $8,379,900 est. value
KY

Assumption High School Expansion
Addition - 35,000 SF
Construction
Louisville, KY 40205

New Pavilion - Hopkins County School
Addition - 960 SF
Pending Verification
$10,000 est. value
Madisonville, KY

Special Inspections RFP - Polo Club Middle School
New Construction, Infrastructure - 170,000 SF
Bidding
Lexington, KY 40509

Ohio Valley Education Co-Op
Renovation, Addition
Post-Bid
Louisville, KY 40258

Central Hardin High School - Bid Group 1
Renovation, Addition
Results
Cecilia, KY 42724

Clark-Moores Middle School
Renovation, Addition
Construction
Less than $6,000,000 est. value
Richmond, KY 40475

Renovation And Expansion Of The Local Area Vocational Education Center (Lavec)
Renovation
Bidding
Louisa, KY 41230

Re-Roof
Post-Bid
Less than $4,617,000 est. value
Morganfield, Sturgis, KY 42437

Reported 10/08/2021 12:00 AM
Project Title

Leslie County High School Secure Entry Vestibule

Physical Address View project details and contacts
City, State (County) Hyden, KY 41749   (Leslie County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a secure entry vestibule within the limits of the existing Leslie County High School. The work includes, but not limited to: selective demolition, hollow metal door frames & doors, solid wood doors, door hardware (including access controls and handicap operators), masonry, carpentry, gypsum board assemblies, casework, acoustical ceilings, floor finishes, painting, mechanical systems, electrical systems, & fire suppression systems. The surrounding buildings and site will be occupied in all phases of construction work.

Details

Middle/Senior High School, Renovation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents