Similar Projects
Airfield Guidance Signage
Bidding
Mesa, AZ

Street Signs and Hardware
Alteration
Bidding
Peoria, AZ

Reflective Bike Lane Green Preformed Thermoplastic Pavement Marking Materials
Term Contract
Post-Bid
Phoenix, AZ 85003

Signage
Post-Bid
Phoenix, AZ 85003

R--Message Billboards; Fire Prevention
Results
Anthem, Bisbee, Black Canyon City, Kingman, New River, Pima, Prescott, Safford, Sonoita, Thatcher, Tombstone, Yarnell, AZ

System Enhancement - Safety Improvements
Results
Less than $1,000,000 est. value

Pavement Marking, Installation, Removal and Rumble Strip Maintenance
Infrastructure
Bidding

Signage Services
Results
Surprise, AZ 85374

CASS, Brifen and USA Cable Barrier Inspection, Maintenance, Repair and Resetting
Results
Ajo, Benson, Flagstaff, Gila Bend, Globe, Grand Canyon, Holbrook, Kayenta, Kingman, Lake Havasu City, Nogales, Payson, Prescott, Quartzsite, Safford, Show Low, Tuba City, Tucson, Wickenburg, Williams, Winslow, Yuma, AZ 86047

Fabrication and Installation of Park Signs
Results
Mesa, AZ 85211

Annual Maintenance for Pavement Marking, Installation, Removal and Rumble Strip Maintenance Statewide
Results

Installation of Paint Stripes and Markings
Results
Phoenix, AZ

Street Transportation Department FY2019 Federal Tap Hawk Installation Design-Bid-Build
Results
Phoenix, AZ 85042

Traffic Attenuator
Results
Phoenix, AZ

Guardrail Installation and Maintenance
Term Contract
Results
AZ

Reported 07/23/2021 12:00 AM
Project Title

Sfs Lot Bollards

Physical Address View project details and contacts
City, State (County) Phoenix, AZ   (Maricopa County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Install 80 4ft bollards as seen on map. Diameter of each bollard would be 4 inches. Each bollard would need to include a blank (cap, no hinge), yellow in color to match the already existing bollards and a yellow plastic cover. Each section of bollards would need a rack in place to store bollards when not in use. These racks would also need to hold the caps when the bollards are in use.

Details

Division 03 - Concrete, Precast Concrete Specialties, Precast Concrete Bollards.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents