Similar Projects
Windermere Ward Trail - Town of Windermere
Infrastructure
Conception
Less than $2,590,000 est. value
Windermere, FL

Windermere Ward Trail - Town of Windermere
Infrastructure
Conception
Less than $2,590,000 est. value
Windermere, FL

Orange County Utilities Site Restoration
Infrastructure
Bidding
$5,866,607 est. value
Orlando, FL

Asphalt Milling and Resurfacing with Friction Course and Asphalt Berms
Infrastructure
Bidding
$63,598,027 est. value
Orlando, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Preservation and Management Plan for Oakland's Historic African-American Cemetery
Infrastructure
Post-Bid
Oakland, FL

SR 417 Widening from John Young Parkway to Landstar Boulevard
Results
Less than $116,845,417 est. value
Orlando, FL 32824

University Boulevard at Rouse Road Intersection Improvements
Results
$1,381,618 est. value
Orlando, FL 32800

Sport Subaru - District West - Site Development
New Construction
Construction
Orlando, FL 32804

Buena Vista Drive North - Median Closure
Construction
Orlando, FL 32800

Lake Underhill Road Widening Segment 3 - Orange County
Infrastructure
Conception
$5,000,000 est. value
Orlando, FL 32885

Collegiate Village Retail - Site Scopes Only
Demolition, Infrastructure, Alteration
Bidding
$8,000,000 est. value
FL

Concrete and Asphalt Restoration Services
Infrastructure
Post-Bid
Orlando, FL

Asphalt Repair
Results
Less than $750,000 est. value
FL

Nextran Orlando
New Construction - 86,811 SF
Construction
$18,000,000 est. value
Orlando, FL 32809

Reported 06/21/2022 03:19 PM
Project Title

Reams Road Widening Project - Orange County

Physical Address View project details and contacts
City, State (County) FL   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected October 2024
Bids Due View project details and contacts
Estimated Value $39,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reams Road will be widened from a two to four-lane roadway, from Summerlake Park Boulevard to Taborfield Avenue. As of June 17, 2022, this project is in the conceptual phase. Information regarding a design team and the contractor selection has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to fall of 2024. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents