Similar Projects
Just In Time Logistics
New Construction - 3,200 SF
Conception
$500,000 to $1,000,000 CJ est. value
Lawrenceville, GA 30043

Polar Service Center
New Construction
Conception
Garden City, GA 31408

Christian Brothers Automotive Corporation
New Construction - 5,265 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Alpharetta, GA 30004

G Commercial Tire and Repair
New Construction - 6,050 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Lawrenceville, GA 30043

Penske Truck Leasing
New Construction - 22,149 SF
Bidding by Invitation
$1,000,000 to $5,000,000 CJ est. value
Forest Park, GA 30354

Countryside Chrysler, Dodge, Jeep
Renovation
Bidding by Invitation
Jackson, GA 30233

0375RR Container Workshop
Post-Bid
Fort Benning, GA

Copart
New Construction - 12,800 SF
Post-Bid
Fairburn, GA 30213

Y--P947- Design-Build, Welding and Body Repair Shop Facility, Marine Corps Logistics Base, Albany, GA
New Construction, Demolition - 30,000 SF
Results
$25,000,000 to $100,000,000 est. value
Albany, GA

US Atlantic Outdoor Storage
New Construction - 15,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Cumming, GA 30041

Classic KARMA
Renovation - 7,000 SF
Construction
Sandy Springs, GA 30350

Mavis Tires & Brakes
New Construction - 6,979 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Macon, GA

GMR Auto Repairs
New Construction - 10,080 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Dacula, GA 30019

Hendrick Mazda Mall of Georgia
New Construction - 3,703 SF
Design
$500,000 to $1,000,000 CJ est. value
Buford, GA 30519

Pep Boys
Renovation - 11,815 SF
Post-Bid
Atlanta, GA 30345

Reported 07/17/2020 02:23 PM
Project Title

Take 5 Oil Change

Physical Address View project details and contacts
City, State (County) Columbus, GA 31904   (Muscogee County)
Category(s) Commercial
Sub-Category(s) Vehicle Sales/Service
Contracting Method Qualified Bidding.
Project Status Seeking Site Plan Approvals
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Vehicle Sales/Service, 1 Story Above Grade, 1,700 SF New Construction, Demolition.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants, Site Furnishings, Trash and Litter Receptacles.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents