Similar Projects
Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

Construct Soldier Pile Retaining Wall, Repair RSP and HMA paving
Infrastructure
Bidding
$16,000,000 est. value
CA

Excavation, HMA, Structural Concrete, Minor Concrete and Drainage
Infrastructure
Bidding
$23,400,000 est. value
CA

Imola Ave and SR-29 Express Bus Improvements Project
Infrastructure
Post-Bid
$2,600,000 est. value
Napa, CA 94559

Roadway Repairs
Infrastructure
Post-Bid
Cloverdale, Fremont, CA 95425

East Blithedale Rehabilitation Project - Phase I
Alteration
Results
$3,000,000 est. value
Mill Valley, CA

Downtown Rehabilitation Project - Phase II
Alteration
Results
$600,000 to $800,000 est. value
Mill Valley, CA

Province at San Gabriel Condominiums
New Construction, Build-Out, Infrastructure
Construction
$20,000,000 est. value
San Gabriel, CA 91776

CA NPS PP SEKI 2018(3) CA NPS PP SEKI 2020(1) Pavement Preservation Lassen Seki Phase I and Pavement Preservation Seki Phase II
Term Contract
Design
Fresno, Sequoia National Park, CA

Heber Avenue Improvements
Infrastructure
Bidding
$953,375 est. value
Heber, CA 92249

Construction Pine Flat Road Repair Project
Infrastructure
Post-Bid
CA

County of Placer - 2021 Roadway Surface Treatments
Alteration
Results
CA

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Folsom Boulevard Complete Streets Phase 1
Infrastructure
Bidding
$5,400,000 est. value
Sacramento, CA

Last Updated 11/03/2021 08:19 AM
Project Title

Cold Plane AC Pavement and Place HMA and Minor Concrete

Physical Address View project details and contacts
City, State (County) CA   (San Bernardino County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $12,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1 070030 Lead Compliance Plan Ls Lump Sum 2 080050 Progress Schedule (Critical Path Method) Ls Lump Sum 3 090100 Time-related Overhead (Wday) Wday 110 4 090205 Dispute Resolution Board on-site Meeting Ea 4 5 090210 Hourly Off-site Dispute-resolution-board-related Tasks Hr 20 6 100100 Develop Water Supply Ls Lump Sum 7 120090 Construction Area Signs Ls Lump Sum 8 120100 Traffic Control System Ls Lump Sum 9 120105 Automated Work Zone Information System Ls Lump Sum 10 120116 Type Ii Barricade Ea 34 11 120149 Temporary Pavement Marking (Paint) Sqft 5,030 12 120159 Temporary Traffic Stripe (Paint) Lf 259,000 13 120165 Channelizer (Surface Mounted) Ea 390 14 120204 Portable Radar Speed Feedback Sign System Day Ea 320 15 120300 Temporary Pavement Marker Ea 4,790 16 124000 Temporary Pedestrian Access Route Ls Lump Sum 17 128651 Portable Changeable Message Sign (Ea) Ea 11 18 128658 End of Queue Monitoring and Warning With Truck Mounted Changeable Message Sign Day Ea 10 19 130100 Job Site Management Ls Lump Sum 20 130300 Prepare Storm Water Pollution Prevention Plan Ls Lump Sum 21 130330 Storm Water Annual Report Ea 1 22 130560 Temporary Soil Binder Sqyd 10,000 23 130620 Temporary Drainage Inlet Protection Ea 5 24 130640 Temporary Fiber Roll Lf 7,500 25 130900 Temporary Concrete Washout Ls Lump Sum 26 141120 Treated Wood Waste Lb 9,240 27 146002 Contractor-supplied Biologist (Ls) Ls Lump Sum 28 146003 Natural Resource Protection Plan Ls Lump Sum 29 170105 Clearing and Grubbing (Acre) Acre 2 30 190101 Roadway Excavation Cy 78 31 204096 Maintain Existing Planted Areas Ls Lump Sum 32 205034 Decomposed Granite Sqft 5,410 33 205035 Wood Mulch Cy 10 34 210010 Move-in/move-out (Erosion Control) Ea 2 35 210120 Duff (Sqft) Sqft 87,200 36 210252 Bonded Fiber Matrix (Sqft) Sqft 87,200 37 220101 Finishing Roadway Ls Lump Sum 38 390011 Prepaving Inertial Profiler Ls Lump Sum 39 390020 Prepaving Grinding Day Ea 3 40 390132 Hot Mix Asphalt (Type a) Ton 68,200 41 394060 Data Core Ls Lump Sum 42 394076 Place Hot Mix Asphalt Dike (Type E) Lf 1,400 43 397005 Tack Coat Ton 290 44 398000 Remove Asphalt Concrete Pavement (Cy) Cy 98 45 398100 Remove Asphalt Concrete Dike Lf 1,400 46 398200 Cold Plane Asphalt Concrete Pavement Sqyd 260,000 47 420201 Grind Existing Concrete Pavement Sqyd 9 48 730070 Detectable Warning Surface Sqft 300 49 731504 Minor Concrete (Curb and Gutter) Cy 200 50 731519 Minor Concrete (Stamped Concrete) Sqft 59 51 731627 Minor Concrete (Curb, Sidewalk and Curb Ramp) Cy 400 52 731850 Remove Concrete (Curb, Gutter, and Sidewalk) (Cy) Cy 320 53 733000 Pre/post Construction Surveys Ea 16 54 012291 Emergency Vehicle Unit Cables Ls Lump Sum 55 780250 Adjust Monument Cover to Grade Ea 38 56 780260 Remove and Replace Monument Ea 79 57 780440 Prepare and Stain Concrete Sqft 59 58 803210 Temporary Desert Tortoise Fence Lf 10,000 59 810170 Delineator (Class 1) Ea 65 60 810190 Guard Railing Delineator Ea 38 61 810230 Pavement Marker (Retroreflective) Ea 720 62 810250 Pavement Marker (Retroreflective-recessed) Ea 4,100 63 820110 Milepost Marker Ea 59 64 820130 Object Marker Ea 4 65 820220 Remove Marker Ea 59 66 820250 Remove Roadside Sign Ea 62 67 820750 Furnish Single Sheet Aluminum Sign (0.063"-unframed) Sqft 720 68 820760 Furnish Single Sheet Aluminum Sign (0.080"-unframed) Sqft 420 69 820840 Roadside Sign - One Post Ea 140 70 820850 Roadside Sign - Two Post Ea 4 71 832005 Midwest Guardrail System Lf 520 72 832070 Vegetation Control (Minor Concrete) Sqyd 250 73 839576 End Cap (Type a) Ea 1 74 839581 End Anchor Assembly (Type Sft) Ea 3 75 839584 Alternative in-line Terminal System Ea 2 76 839752 Remove Guardrail Lf 400 77 840583 6" Two-component Paint Traffic Stripe Lf 252,000 78 840584 8" Two-component Paint Traffic Stripe Lf 5,020 79 840637 Two-component Paint Pavement Marking Sqft 6,830 80 846046 6" Rumble Strip (Asphalt Concrete Pavement) Sta 120 81 846051 12" Rumble Strip (Asphalt Concrete Pavement) Sta 760 82 870009 Maintaining Existing Traffic Management System Elements During Construction Ls Lump Sum 83 872133 Modifying Signal and Lighting Systems Ls Lump Sum 84 872135 Modifying Traffic Monitoring Stations Ls Lump Sum 85 999990 Mobilization Ls Lump Sum

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents