Greenway Commons
New Construction - 20,000 SF
Conception
$70,000,000 est. value
Southington, CT

Collins Axe Factory Development Plan
New Construction, Renovation
Conception
Collinsville, CT

North Crossing
New Construction - 260,000 SF
Design
$200,000,000 est. value
Hartford, CT

Shuttle Meadow Country Club Condos
New Construction
Design
Berlin, CT

270 Albany Avenue Redevelopment Project
New Construction, Renovation
Bidding
Hartford, CT 06120

Westbrook Village Phase IV
New Construction
Sub-Bidding
Hartford, CT 06105

Former Showcase Mixed-Use Development
New Construction
Post-Bid
East Hartford, CT 06108

Property Offered for Redevelopment at 488 Farmington Avenue
Renovation - 4,600 SF
Post-Bid
Hartford, CT

Remediation and Redevelopment located at One and Sixty-Three West Main Street
Results
Plainville, CT 06062

Rehabilitation at Mary Shepard Place Apartments, Bellevue Street and Sanford Street Apartments
Renovation
Results
$15,000,000 to $20,000,000 est. value
Hartford, CT 06120

Manchester Parkade Redevelopment
New Construction
Construction
$150,000,000 est. value
Manchester, CT 06040

HOH Boiler House
Renovation - 6,277 SF
Construction
$8,000,000 est. value
Hartford, CT 06100

North Washington Street Apartments
New Construction - 24,394 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Plainville, CT

Bond Residences
Renovation
Pending Verification
$1,000,000 est. value
Hartford, CT 06103

The Hamlet on East Street - Phase III
New Construction - 40,000 SF
Conception
Suffield, CT 06078

Reported 02/19/2022 12:00 AM
Project Title

Veterans Terrace Phase 2

Physical Address View project details and contacts
City, State (County) East Hartford, CT 06108   (Hartford County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $10,900,000
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Project requires the abatement of ACM & PCB’s and select demolition (from top of existing foundation up) of (7) existing residential six (6) unit buildings & (1) existing residential four (4) unit building. Also, there are (2) existing (4) unit residential and (1) community building that require abatement of ACM & PCB’s and complete demolition including foundations. Excavation and installation of foundations and slabs on grade at (1) new apartment building, infill of saved full basement foundations and placement of concrete slab on grade @ (8) buildings. All (8) selectively demo’d & (1) new building will be stick framed new construction, with engineered open web floor joist and roof trusses. New site features include add'l parking, underground utilities, security system, fencing & landscaping.

Details

Division 01 - General Requirements, Summary, Contract Modification Procedures, Execution.
Division 02 - Existing Conditions, Geotechnical Investigations, Exploratory Excavations, Demolition, Structure Demolition, Selective Demolition.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Cast Underlayment, Gypsum Cement Underlayment.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Miscellaneous Rough Carpentry, Wood Decking, Wood Patio Decking, Sheathing, Finish Carpentry, Exterior Finish Carpentry, Architectural Woodwork, Interior Architectural Woodwork, Wood Stairs and Railings.
Division 07 - Thermal and Moisture Protection, Thermal Insulation, Shingles and Shakes, Asphalt Shingles, Siding, Sheet Metal Flashing and Trim, Firestopping, Penetration Firestopping, Joint Sealants.
Division 08 - Openings, Metal Doors and Frames, Hollow Metal Doors and Frames, Metal Doors, Hollow Metal Doors, Wood Doors, Stile and Rail Wood Doors, Composite Doors, Fiberglass Doors, Access Doors and Panels, Access Doors and Frames, Plastic Windows, Vinyl Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board Assemblies, Tiling, Resilient Flooring, Resilient Base and Accessories, Resilient Tile Flooring, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Emergency Access and Information Cabinets, Emergency Key Cabinets.
Division 11 - Equipment, Parking Control Equipment, Residential Appliances.
Division 12 - Furnishings, Window Blinds, Horizontal Louver Blinds, Specialty Casework, Residential Casework, Countertops, Stone Countertops.
Division 21 - Fire Suppression, Common Work Results for Fire Suppression, Vibration and Seismic Controls for Fire-Suppression Piping and Equipment.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Division 28 - Electronic Safety and Security, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Trenching and Backfilling.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Fences and Gates, Chain Link Fences and Gates, Turf and Grasses, Plants.
Division 33 - Utilities, Water Utility Distribution Piping, Site Water Utility Distribution Piping, Sanitary Utility Sewerage Piping, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents