Similar Projects
Smithbridge Rd. Corridor(L)
Infrastructure
Conception
$2,895,000 CJ est. value
Chadds Ford, PA 19317

Smithbridge Rd. Corridor(L)
Infrastructure
Conception
$2,895,000 CJ est. value
Chadds Ford, PA 19317

Marshall Rd o/ Cobbs Creek
Infrastructure, Renovation
Design
$12,440,000 CJ est. value
Upper Darby, PA 19082

Marshall Rd o/ Cobbs Creek
Infrastructure, Renovation
Design
$12,440,000 CJ est. value
Upper Darby, PA 19082

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Observatory Park Recreational Improvements
Infrastructure
Post-Bid
$500,000 CJ est. value
Darby, PA 19023

Newtown Township Line Restoration Projects
Infrastructure
Results
$53,026 CJ est. value
Newtown Square, PA 19073

Newtown Township Line Restoration Projects
Infrastructure
Results
$53,026 CJ est. value
Newtown Square, PA 19073

Villanova University - St Mary`s Hall Gymnasium Pool Infill
Construction
Villanova, PA 19085

Residence Inn by Marriott Hotel / Newtown Square
New Construction, Infrastructure - 26,613 SF
Pending Verification
$8,000,000 CJ est. value
Newtown Square, PA 19073

Estates at Coventry Woods Phase 2A
New Construction, Infrastructure
Pending Verification
$10,500,000 CJ est. value
Springfield, PA 19064

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

State Rd o/Darby Creek
Infrastructure, Renovation
Design
$9,020,000 CJ est. value
Media, PA 19063

Resurfacing of Certain Roads
Infrastructure
Post-Bid
Rose Valley, PA

Mckinley Park Tot Lot Site Improvements
Infrastructure
Results
Lansdowne, PA 19050

Last Updated 06/14/2023 11:16 AM
Project Title

Bridge #94 Manchester Avenue Rehabilitation

Physical Address View project details and contacts
City, State (County) Media, PA 19063   (Delaware County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

MANCHESTER AVENUE REHABILITATION

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents