Similar Projects
Green Leaf Community at Childress
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Atlanta, GA 30311

3356 Peachtree Road Buckhead Residential Tower
New Construction, Infrastructure
Conception
$75,000,000 CJ est. value
Atlanta, GA 30326

The Front Porch at Auburn Avenue
New Construction, Infrastructure - 38,000 SF
Design
$18,000,000 CJ est. value
Atlanta, GA 30334

Parkwood / Hardee Street
Demolition, New Construction, Infrastructure - 8,745 SF
Design
$12,900,000 CJ est. value
Atlanta, GA 30307

Greensferry Stream and Floodplain Restoration Project
Infrastructure
Bidding
$6,996,000 CJ est. value
Atlanta, GA 30334

Murphy Crossing Redevelopment / Atlanta
New Construction, Renovation, Infrastructure
Post-Bid
$100,000,000 CJ est. value
Atlanta, GA 30310

RFP Design - Construction Professional (CP) Services for Atlanta Unbound Academy, Construction of New K-8 School
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
College Park, GA 30337

980 Crest Valley Drive Stormwater Improvement Project
Infrastructure
Results
$279,562 CJ est. value
Atlanta, GA 30327

Upgrades to Hemphill Pump Station
Renovation, Infrastructure
Results
$13,771,047 CJ est. value
Atlanta, GA 30334

Center for Advanced Surgical Services (CASS)
New Construction, Infrastructure - 556,000 SF
Construction
$180,600,000 CJ est. value
Atlanta, GA 30303

The Lodge/Abbington at Ormewood Park
Demolition, New Construction, Infrastructure - 41,504 SF
Construction
$6,000,000 CJ est. value
Atlanta, GA 30316

Hotel at Southern Post / Roswell
Demolition, New Construction, Infrastructure - 82,091 SF
Pending Verification
$20,000,000 CJ est. value
Roswell, GA 30075

Expansion of Tech Square, Phase IIIA
Demolition, Infrastructure, Renovation - 119,000 SF
Pending Verification
$40,000,000 CJ est. value
Atlanta, GA 30334

Old Riverside Park Construction - City of Sandy Springs
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Sandy Springs, GA 30328

260-270 Drummen Court Drainage Improvement and Maintenance
Infrastructure
Design
$257,664 CJ est. value
Sandy Springs, GA 30328

Last Updated 02/20/2024 03:07 PM
Project Title

RFQ Construction Manager at Risk - Research Tower

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30334   (Fulton County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Site Development
Contracting Method Competitive Bids
Project Status Request for Qualifications, Design Development, Construction start expected July 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $76,500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 20, 2024, construction is currently scheduled to start mid-July, 2024. Georgia State Financing and Investment Commission (GSFIC), as "Owner", on behalf of the Board of Regents of the University System of Georgia ("Using Agency" or "BOR"), is seeking firms interested in providing construction management at-risk services for a project known as Project Research Tower, at Georgia State University in Atlanta, Georgia. New construction of a 120,000 SF science research and instructional building (anticipated to be 8-10 stories depending on site constraints) to support GSU's growing science research and teaching program. The building is anticipated to be compatible in form and appearance to the two earlier projects in the Science Research Center on the Atlanta campus, and have a complementary space program. Space allocation is anticipated to be for research labs (~40%), instructional labs (~15%), office and service space (~14%), special instructional space (vivarium) (~12%), classrooms (~5%), student study (~5%), and building support (9%). Interior space, particularly the research labs, will employ contemporary design with a focus on flexibility to support a growing and evolving research program. Upper floors may be connected with adjacent buildings to enhance security, promote communication and circulation, and economize on shared services. The building is proposed to use natural light to create an open and inviting environment Deadline for submission of written questions and requests for clarification - 8/1/2022 2:00 PM Deadline for submission of written questions and requests for clarification. Questions from Construction Professionals about any aspect of the RFP, or the project, shall be submitted in writing (email is preferable) to: Andrew Triemer, Contracts Manager ----- 404-717-0107 andrew.triemer@gsfic.ga.gov The preliminary Stated Cost Limitation (SCL) or construction cost of the project is estimated at $76,500,000.00. The final SCL may be revised by the Owner due to final programmatic requirements, funding availability or other circumstances. The Design Professional's services are anticipated to commence by Fall 2022 with construction documents anticipated for completion in Fall 2023. The start of construction is contingent on the availability of funding. (All of the dates above are estimates which are subject to change).

Details

10 Stories Above Grade, 120,000 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents