Similar Projects
West City Line to CSAH 2 - Wright County
Infrastructure
Conception
$522,000 CJ est. value
Maple Lake, MN 55358

TH 25 to CSAH 14 - Wright County
Infrastructure
Conception
$603,000 CJ est. value
Maple Lake, MN 55358

Reconstruction
Infrastructure
Design
$9,100,000 CJ est. value
Buffalo, MN 55313

3rd Avenue Apartments
New Construction, Infrastructure
Design
$8,000,000 CJ est. value
Buffalo, MN 55313

2023 Wastewater Facilities Upgrade
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Saint Michael, MN 55376

2023 Street Improvements
Infrastructure
Bidding
$900,000 CJ est. value
Maple Lake, MN 55358

TH 24/Hemlock Street Roundabout and Hemlock Street Full Depth Reclamation
Infrastructure
Post-Bid
$2,269,748 CJ est. value
Annandale, MN 55302

Rockford Schools Site Improvements
Infrastructure
Post-Bid
$2,300,000 CJ est. value
Rockford, MN 55373

2021 Downtown Improvement Phase 2
Infrastructure
Results
Montrose, MN

South Haven Water Tower - Infrastructure Improvements Project
Renovation, Infrastructure
Results
$1,160,400 CJ est. value
South Haven, MN 55382

CSAH 37 Reconstruction Project
Infrastructure
Construction
$6,789,521 CJ est. value
Maple Lake, MN 55358

Monticello Meadow Townhomes
New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Monticello, MN 55362

Settler's Brook
New Construction, Infrastructure
Pending Verification
$52,000,000 CJ est. value
Buffalo, MN 55313

94 to Palmgren - Wright County
Infrastructure
Conception
$3,100,000 CJ est. value
Maple Lake, MN 55358

Median Crossover Construction - TH 35
Infrastructure
Design
$950,000 CJ est. value
Annandale, MN 55302

Last Updated 03/20/2023 08:12 AM
Project Title

Albertville Self-Storage Facility

Physical Address View project details and contacts
City, State (County) Albertville, MN 55301   (Wright County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of an 8 building self storage facility totaling 90,185 square feet. As of March 20, 2023, the project is currently on hold. An architect has been selected. Information regarding a general contractor has not been provided. A firm timeline for construction has not been determined.

Details

90,185 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents