Similar Projects
State Street Residences
New Construction, Demolition - 108,480 SF
Design
$10,000,000 CJ est. value
Teaneck, NJ 07666

Walcott Hackensack
New Construction - 371,990 SF
Construction
Hackensack, NJ 07601

Emerson Station
New Construction - 15,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Emerson, NJ

Grand Avenue Apartments
New Construction, Demolition
Design
Englewood, NJ 07631

Bennett Road Residential Development
New Construction
Construction
$34,260,000 est. value
Englewood, NJ 07631

State Street Residential Building
New Construction - 265,094 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Teaneck, NJ 07666

Park Ridge Station
New Construction - 17,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Park Ridge, NJ 07656

River Road Apartments
New Construction
Design
Edgewater, NJ 07020

Sussex Street Apartments
New Construction
Construction
$8,500,000 est. value
Hackensack, NJ 07608

North Central Road Apartments
Renovation
Design
Fort Lee, NJ 07024

Multi-Level Self-Parking Structure at Hudson Street
New Construction
Conception
$10,992,000 est. value
Ridgewood, NJ 07450

Summit Avenue Active Adult Community
New Construction
Pending Verification
Montvale, NJ 07645

116 Essex Apartments
New Construction - 14,950 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Hackensack, NJ 07601

Apartment Buildings
New Construction
Design
Carlstadt, NJ 07072

The Valley Hospital - Eastern Campus
New Construction - 910,000 SF
Post-Bid
$738,000,000 est. value
Paramus, NJ 07652

Reported 03/15/2019 12:00 AM
Project Title

Allen Street Community Parking Facility

Physical Address View project details and contacts
City, State (County) Cresskill, NJ   (Bergen County)
Category(s) Heavy and Highway
Sub-Category(s) Parking Garage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description Contract generally consists of Site Work and Electrical Work Site Work shall include, but is not limited to: installation of soil erosion and sediment control devices, traffic control, tree removal, clearing site including sawcutting, as required, removal of concrete curbs, sidewalks and pavements both concrete and asphalt, milling of hot mix asphalt (HMA), constructing dense graded aggregate base course and HMA intermediate and surface course pavements, constructing storm drains for surface and rooftop drainage, constructing and reconstructing inlets and manholes, constructing 4" and 2" rigid nonmetallic conduit for future cable and wire installations by Verizon and Altice USA, constructing granite curb, constructing concrete sidewalk and curb ramps with detectable warning surface, construction of masonry enclosures for a single shared use vertical compaction system (equipment by others) and a single shared use container facility for recycling operations, installing steel and concrete bollard protection systems, applying traffic stripes and traffic markings, installing regulatory and warning signs, topsoiling, fertilizing, seeding and mulching, the planting of trees and shrubs, and other incidental work. Electrical Work shall include, but is not limited to: the installation of: 4 (four) new underground, single phase electric service connections from a proposed pad mount transformer installation by Rockland Electric Company, including new meter pans and replacement service feed connections from meter to panel at each location, 3 (three) new underground, three phase electric service connections from existing/proposed pole mounted transformer locations, including new meter pans and replacement service feed connections from meter to panel at each location, 13 (thirteen) new pole mounted LED lighting fixtures and the installation of one new underground electrical circuit for the proposed vertical compaction system (equipment by others) and other incidental electrical work.
Details
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 26 - Electrical, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents