Similar Projects
Roof Restoration and Weatherization Project
Post-Bid
Thatcher, AZ 85552

River Valley Roof Replacement
Post-Bid
Bullhead City, AZ 86442

Murphy-Wilmot Library Roof Replacement
Results
$275,000 to $325,000 est. value
Tucson, AZ 85711

Z--Roof Replacement on Park Housing Unit
Results
$25,000 to $100,000 est. value
Ganado, AZ

General Contractor for a Roof Restoration and Weatherization Project at Desert Mirage Elementary School
Post-Bid
Glendale, AZ 85305

Richardson Elementary School Re-Roof
Results
Tucson, AZ 85741

Metal Roof System for Cove Senior Citizens Center
Post-Bid
AZ

SFB Roofing Project at Cholla Middle School
Results
Phoenix, AZ 85029

Roof Replacement, Repair and Related Services
Post-Bid
Prescott, AZ 86305

Repair of Roof Structure Building 223 MCAS Yuma AZ
Results
$100,000 to $250,000 est. value
Yuma, AZ 85369

Pinon Middle School Roof Replacement
Post-Bid
Pinon, AZ

Copper King Roof Restoration
Results
Phoenix, AZ 85037

TCRHCC Roofing Project
Renovation - 11,797 SF
Post-Bid
Tuba City, AZ 86045

Z--Organ Pipe Cactus National Monument: Install Shade
Results
Ajo, AZ 85321

Roofing Project at Picacho Elementary School
Post-Bid
Picacho, AZ 85141

Last Updated 05/27/2020 08:41 AM
Project Title

Mormon Lake Work Center Office Roof Replacement, Coconino National Forest, Flagstaff Ranger District, Arizona

Physical Address View project details and contacts
City, State (County) Flagstaff, AZ 86001   (Coconino County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000 to $75,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of demolishing the existing asphalt roof and installing a new 3-tab asphalt roof. The new roofing system shall include all the manufacturer’s compatible accessories including, but not limited to underlayment, felt, adhesives, roof jacks, vent flashings, edge and corner components, valley components, drip flashing, etc. The project includes all labor, materials, and equipment necessary to perform all the operations for the work specified. Option #1 work consists of replacing roof substrate as necessary. Option #2 work consists of adding soffit vents to the existing blocking. Option #3 work consists of installing a PBR metal roof instead of an asphalt shingle roof. The contractor shall provide a cost for the base bid to install an asphalt roof, option #1 bid to replace roof substrate, option #2 bid to install soffit vents, and option #3 bid to install a PBR metal roof. If option #3 is awarded, there will be a contract modification to remove pay item 073113(01) MLWC OFFICE ASPHALT SHINGLES and replace it with pay item 074113(01) MLWC OFFICE PBR METAL ROOF.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents