Similar Projects
NOAA Calcasieu Pass Single Pile Instrumentation Pile Repair, Calcasieu, LA
Term Contract
Post-Bid
$100,000 to $250,000 est. value
Calcasieu, LA

Modernization of Housing 2018 CFP, Bathroom Renovations
Renovation
Bidding
Saint Martinville, LA

Plaquemines (Walker Road) Boat Launch
Infrastructure
Post-Bid
$186,042 est. value
Belle Chasse, LA

Metairie Country Club
New Construction, Demolition - 366 SF
Conception
Less than $500,000 CJ est. value
Metairie, LA 70005

Blind River Boat Launch Improvements
Infrastructure
Post-Bid
Convent, LA

Newly Constructed Restrooms Male/Female
New Construction
Post-Bid
Hahnville, LA

Globalplex Holcim Dock Repairs
Infrastructure
Post-Bid
Reserve, LA

Mallard Golf Club Lake Charles Clubhouse and Pro Shop
New Construction
Results
Lake Charles, LA

Calcasieu Jetty Repairs
Alteration
Post-Bid
Cameron, LA

Summerfield Park - Restroom Facilities
New Construction, Infrastructure, Alteration
Post-Bid
Houma, LA

La 27: Cameron Ferry Landing Repairs
Infrastructure
Results
$500,000 to $1,000,000 est. value
LA

Calcasieu River and Pass, LA East and West Jetty Repairs
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Cameron, LA

Metairie Country Club
New Construction - 366 SF
Conception
Less than $500,000 CJ est. value
Metairie, LA 70005

Post Hurricane Restoration Project at Big Lake Pier - LOC D
Infrastructure
Post-Bid
Lake Charles, LA 70607

Reported 08/18/2021 12:00 AM
Project Title

Repair Toledo Bend Rec Site

Physical Address View project details and contacts
City, State (County) Fort Polk, LA   (Vernon County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Restroom/Bath House
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This is a design build project. The scope of work will consist of the following: Demolition of Bldg 10056, to include vending area, foundation, and utility lines. Design an construction of a new bathhouse with latrine, showers, laundromat areas in the footprint of the former Bldg 10056. Total square footage is 2,000 square feet. Design and construct of a “family” bathroom area within the new facility separate from the men’s and women’s facilities. Design and construct a mechanical room (exterior). Design and construct a janitor’s closet. Furnish a temporary shower trailer. Remove existing roof and construct new R panel roofing on Bldg. 10019. Remove the existing wood porch deck and retaining wall at Bldg. 10022, and construct a new wood porch deck and concrete retaining wall.

Details

1 Restroom/Bath House, 2,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents