Similar Projects
Apex Community Downtown Streetscape and Parking
Design
Apex, NC 27502

C-5604Aa Kelly And Apex Barbecue Pedestrian Improvements
Bidding
Apex, NC

Parking Lot Asphalt Replacement
Post-Bid
Raleigh, NC 27607

Glen Eden Tennis Access Sidewalk
Post-Bid
Raleigh, NC

New Hope Church Road Improvements and Green Road Sidewalk
Results
Raleigh, NC

James Street to Downtown Pedestrian Improvements
Results
Less than $654,799 est. value
Apex, NC

Sheetz Generosity - Sitework
New Construction
Construction
Raleigh, NC

Chick-Fil-A Sitework
Addition
Construction
Raleigh, NC 27607

Hertz Car Rental
Renovation
Post-Bid
Raleigh, NC 27623

Parking Lot Replacement - 512 Brickhaven Drive
Results
Less than $800,000 est. value
Raleigh, NC

GoCary Amenity Improvements
Post-Bid
Cary, NC

Southern Wake Campus - ADA Accessibility Upgrades
Results
Less than $1,000,000 est. value
Raleigh, NC

Gocary Bus Amenity Improvements
Post-Bid
Cary, NC

Historic Christian Church Parking Lot Project
Results
Morrisville, NC 27560

Sidewalk Replacement Project
Post-Bid
Raleigh, NC

Reported 01/17/2020 12:00 AM
Project Title

Procter Farm Preserve

Physical Address View project details and contacts
City, State (County) Wendell, NC 27591   (Wake County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Procter Farm Preserve project consists of the construction of a gravel entrance road, one new parking lot, sidewalks, equestrian trails, landscaping, stormwater control measure, signage, and related site and infrastructure improvements. Work will also include all associated items as per the contract documents.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 10 - Specialties, Signage.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents