Similar Projects
East Village Infrastructure
Post-Bid
$7,686,825 est. value
Charlotte, NC

Wake Forest Road/Blount Street/Person Street Phase I Improvements
Post-Bid
Raleigh, NC

Optional Industry Forum and DBE Outreach Session
Results
Less than $2,200,000,000 est. value

Optional Industry Forum and DBE Outreach Session
Results
Less than $2,200,000,000 est. value

Harris Teeter #345
Renovation - 58,652 SF
Construction
$3,509,985 est. value
Burlington, NC 27215

Ligon Mill Road Improvements
Post-Bid
Wake Forest, NC

Upgrading U.S. 70 to a Freeway
Results
NC

East River Phase 1 Project
Post-Bid
Clayton, NC 27527

Triangle Expressway Southeast Extension, NC 55 Bypass to East of Pierce Olive Road
Results
NC

AST Paving and Resurfacing Project
Post-Bid
Raleigh, NC

Asphalt Resurfacing
Results
Hillsborough, NC

Crossfield Taxiway - Package 1
Post-Bid
Greensboro, NC 27409

Automatic Meter Reading System Project
Results
NC

International Drive Pavement Rehabilitation
Post-Bid
Less than $5,000,000 est. value
Morrisville, NC 27560

Area 1 Elementary School Off-Site Utilities
Results
Carthage, NC

Reported 03/19/2021 12:00 AM
Project Title

2020 Street, Drainage, Water and Sewer Improvements

Physical Address View project details and contacts
City, State (County) Dunn, NC 28334   (Harnett County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $630,000 to $730,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The construction work will consist of the following areas of work and approximate quantities: 1. Bay Street – Street & Storm Piping Improvements a. Rebuild Street: 1,200 SY Geogrid, 600 Tons CABC, 170 Tons Pavement b. Storm Piping: 325’ 48” RCP, 52’ 18” RCP, 96’ 15” RCP 2. Broad & General Lee – Water & Storm Piping Improvements a. Water Line: 290’ 6” DIP, 280’ 2” PVC, Renew 16 Services b. Storm Piping: 525’ 30” RCP, 18’, 5” RCP, 5 Storm Manholes 3. Watauga Street – Street, Water & Sewer Improvements a. Water Line: 740 - 6” PVC, 180’ - 6” DI b. Sewer Line: 540’ - 8” PVC c. Street Improvements: 9,400 Sy. FDR 1,150 Tons Pavement, 800 Tons CABC Wedging 4. Alternate Bid a. 300’- 8” PVC Water 3/18/21 PARTIAL REBID Description The construction work will consist of the following areas of work and approximate quantities Bay Street – Street Improvements Base Bid Rebuild Street: 1,200 SY Geogrid, 600 Tons CABC, 170 Tons Pavement Alternate Bid Alternate Bid for use of FDR Methods on Bay Street Watauga Street – Street Improvements Street Improvements: 9,400 SY FDR. 1,150 Tons Pavement 800 Tons CABC Wedging

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents