Similar Projects
Main Street District (MSD) Water System Improvements
Infrastructure
Bidding
$459,000 est. value
Truth or Consequences, NM

Chupadero Water-Sewage Corporation Water System Improvements
Infrastructure
Bidding
$1,090,000 est. value
Chupadero, NM

El Creston MDWCA Water System Improvements Project
Post-Bid
Las Vegas, NM 87701

Water System Improvements
Post-Bid
$540,000 to $610,000 est. value
Tatum, NM

Valle Del Rio Water System Improvements
Results
La Mesa, NM

Jacquez Road Line Extension
Results
$99,856 est. value
La Mesa, NM 88021

West Side Water Main Replacement I.H.S
Infrastructure
Construction
San Felipe Pueblo, NM

NM 811 Utility Location Services
Term Contract, Infrastructure
Bidding
$2,000,000 est. value
Santa Fe, NM

Riverside Waterline and Spring Tank Replacement
Post-Bid
Ruidoso Downs, NM

Pena Blanca Water and Sanitation District Water System Improvements
Results
Pena Blanca, NM 87041

Waterline Extensions from Well No. 6 along US Highway 64
Infrastructure
Bidding
$500,000 est. value
El Prado, NM

Lea County Airport Water and Sewer Extension
Post-Bid
Hobbs, NM 88240

Construction of the Union Del Llano Phase II Water System Improvements
Results
Llano, NM 87543

Waterline Extensions From Well No. 5 Along US Highway 64
Infrastructure
Bidding
$400,000 est. value
El Prado, NM

Engineering Services for Pinecliff Water and Sewer System Improvements
Post-Bid
Ruidoso, NM

Reported 06/18/2022 12:00 AM
Project Title

Non-Point Source Pollution Prevention Project for the Santa Clara Creek Watershed - 2022

Physical Address View project details and contacts
City, State (County) NM   (Rio Arriba County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT DESCRIPTIONThe Santa Clara Pueblo Office of Environmental Affairs is seeking contractual services to build non-point source best management projects within areas of the Santa Clara Creek Watershed, primarily in the tributaries to the Santa Clara Creek within Santa Clara Canyon. The implementation of these projects will reduce the impacts of non-point source pollution and lead to the improvement of surface water quality in the Santa Clara Creek Watershed. Any proposals received after the time and date deadline will not be considered or reviewed. The Santa Clara Pueblo reserves the right to reject bids when not complete or responsive. FOR ADDITIONAL INFORMATION, you may call Dino Chavarria at (505) 692-6270 or email at the address.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents