Similar Projects
Last Updated | 08/08/2022 07:03 AM |
Project Title | Burien Park Electrical Service Upgrade |
Physical Address | View project details and contacts |
City, State (County) | Burien, WA 98166 (King County) |
Category(s) | Residential, Single Trades |
Sub-Category(s) | Apartments/Condominiums, Electric |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $115,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The King County Housing Authority will accept Bids from Qualified General Contractors to furnish labor, materials and necessary equipment to complete the removal & replacement of electrical system as listed in the bid documents. Buren Park is a four story, one hundred two unit stick frame built building constructed in 1982. The building currently houses an elderly & disabled population. The original main power system that supplies power to the common areas, security systems, elevators, doors, & fire panel requires an additional circuit for an elevator rehab project. This project consists of replacing the main power box to accommodate an additional 20 amps. The existing box is undersized & will require upsizing the main power lead & panel from the City's transformer to a 400 amp service. The current system is a 320 amp box but cannot accommodate an additional 20 amp circuit. The base scope will include the design & building of temporary power, demolition of existing systems, & installation of new panels, breakers, feeder lines from the City transformer to the new panel (CT box), wiring, & junction boxes. The Contractor is to include in their bid the design & build of a temporary power system for the entire building, meeting all jurisdictional requirements, & power outages not to exceed eight hours in duration. Contractor to coordinate with Seattle City Light & City of Burien for inspections & jurisdictional requirements for temporary & permanent power hook-ups. After electrical approval from the City of Burien, the Contractor will be responsible for coordinating with Seattle City Light to install new permanent power from the external transformer to the new interior CT cabinet. After permanent power has been connected to the building, it will be up to the Contractor to make final connections. The power to the building must be turned back on at the end of each workday. Question deadline: 07/07/2022 at 02:00 p.m. Amount: Five (5%) Percent of the Total bid must accompany Each Bid greater than one hundred fifty ($150,000) dollars. Payable to: King County Housing Authority Process: Bid Bond or Certified Check will be returned to the Unsuccessful Bidders within Ten (10) Days after the Contract Award. Provide with your bid proposal, a written statement from the contractors bonding agent of the contractors ability and capacity for providing a one hundred (100%) percent Performance and Payment Bond for the project. The statement shall be made on the official letterhead of the bonding company and signed by an authorized agent of the bonding company. The King County Housing Authority reserves the right to reject any or all bids or to waive any informality in the bidding. No bid shall be withdrawn for a period of thirty (30) calendar days subsequent to the opening of the bids without the written consent of KCHA. The King County Housing Authority is an Equal Employment Opportunity Employer and strongly encourages minority-owned and women-owned businesses, socially and economically disadvantaged businesses, and small businesses to submit bids or to participate as subcontractors and suppliers on KCHA Contracts. The King County Housing Authority reserves the right to reject any or all bids or to waive any informality in the bidding. No bid shall be withdrawn for a period of thirty (30) calendar days subsequent to the opening of the bids without the written consent of KCHA. Contractor Selected Emerald Electric NW Contract amount: 115,000 Date selected: 07/14/2022 |
||||||||||||||||||||||||||||||||
Details | 4 Stories Above Grade, Apartments, 102 Unit(s).
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |