Similar Projects
Water Utility Project No. 137
Infrastructure
Bidding
$2,625,000 to $3,063,000 est. value
Bismarck, ND

Sewer Utility Project No. 85
Infrastructure
Bidding
$514,000 to $600,000 est. value
Bismarck, ND

Bolley Drive Reconstruction
Post-Bid
$342,260 to $344,066 est. value
Fargo, ND 58102

Paving, Sanitary Sewer, Storm Sewer, Water Main Improvements
Post-Bid
$3,000,000 to $3,500,000 est. value
Valley City, ND

Lincoln Road Shared Use Path West Extension
Results
Less than $500,000 est. value
Lincoln, ND

South Regional Water Connection Phase 2
Results
$2,000,000 est. value
Fargo, ND

US 12, JCT US 85 E to Near 3rd Ave SE (Bowman) and US 85, JCT US 12 N to near 11th ST NE (Bowman) and US 12, RHAME E to JCT US 85 (Bowman) Full Depth Reclamation, HMA, Concrete Reconstructed Intersections and ADA Ramps
Infrastructure
Bidding
$5,500,001 to $6,000,000 est. value
ND

2021 Pavement Rehabilitation and Micro Surfacing
Post-Bid
ND

Sanitary Sewer, Water Main, Storm Sewer, Paving and Incidentals
Results
Less than $1,971,919 est. value
Fargo, ND 58102

CMC 0949, JCT 81St Avenue S N to JCT CMC 4 (Horace)- Mill and Overlay, ADA Curb Ramps, Subcut, Inlet and Riprap
Infrastructure
Bidding
$6,000,001 to $7,000,000 est. value

New Paving and Utility Construction Improvement
Post-Bid
$1,341,041 est. value
Fargo, ND

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Asphaltic Concrete Pavement and Related Items in Street Improvement District - 560
Infrastructure
Bidding
Bismarck, ND

2021 Cass County RCB (Suppliers)
Post-Bid
ND

Water Main Replacement, Street Reconstruction and Incidentals
Results
Less than $3,523,290 est. value
Fargo, ND 58102

Reported 03/18/2022 12:00 AM
Project Title

Replat of West Ridge 1st Street Improvements

Physical Address View project details and contacts
City, State (County) Dickinson, ND   (Dunn County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Completion Expected October 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

From I-94 exit 59 travel north to West Ridge Dr. Turn left on West Ridge Dr and travel west to 40th Ave W. Turn Right onto 40th Ave W and travel North to project located along 40th Ave W, at the intersection of 40th Ave W and 12th St W, and along 44th Ave W and at the intersection of 45th Ave W and 14th St W. Removal of asphalt pavement and replacement with concrete pavements Re-shape base materials in repair areas Adjustment of water valves, sewer manholes and storm inlets

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents