Similar Projects
I-205 Widening and Abernethy Bridge Seismic Upgrades Phase 1 and 2
Infrastructure
Conception
$500,000,000 CJ est. value
Oregon City, OR 97045

I-205 Widening and Abernethy Bridge Seismic Upgrades Phase 1 and 2
Infrastructure
Conception
$500,000,000 CJ est. value
Oregon City, OR 97045

OR 43: Arbor Dr - Hidden Springs Rd
Infrastructure
Design
$3,935,000 CJ est. value
West Linn, OR 97068

OR 43: Arbor Dr - Hidden Springs Rd
Infrastructure
Design
$3,935,000 CJ est. value
West Linn, OR 97068

Request For Qualifications For Harvey Street Improvements
Infrastructure
Bidding
$3,266,000 CJ est. value
Milwaukie, OR 97222

Request For Qualifications For Harvey Street Improvements
Infrastructure
Bidding
$3,266,000 CJ est. value
Milwaukie, OR 97222

I-205 Improvements 1A - Or43 To Or213 Section of the East Portland Freeway
Infrastructure
Post-Bid
$30,000,000 est. value
OR

RFP D/B - Tri-City Water Resource Recovery Facility (WRRF) Outfall Project
Infrastructure
Post-Bid
$44,400,000 CJ est. value
Oregon City, OR 97045

South End Road MP 3.8
Infrastructure
Results
$330,000 to $340,000 est. value
Oregon City, OR

Webster Area Paving Project
Infrastructure
Results
$775,000 est. value
Oregon City, OR

Public Works Operations Complex
New Construction, Infrastructure, Renovation
Construction
$19,000,000 CJ est. value
Wilsonville, OR 97070

Public Works Operations Complex
New Construction, Infrastructure, Renovation
Construction
$19,000,000 CJ est. value
Wilsonville, OR 97070

Deer Valley Residential Care Facility
New Construction, Infrastructure - 26,508 SF
Pending Verification
$6,000,000 CJ est. value
Happy Valley, OR 97086

Deer Valley Residential Care Facility
New Construction, Infrastructure - 26,508 SF
Pending Verification
$6,000,000 CJ est. value
Happy Valley, OR 97086

Waluga Pressure Zone Pipe Resiliency Improvements: (R- 01) - City of Lake Oswego
Infrastructure
Conception
$1,140,000 CJ est. value
Lake Oswego, OR 97035

Last Updated 05/10/2023 05:01 PM
Project Title

Lake Oswego Aquatic Rec Center

Physical Address View project details and contacts
City, State (County) Lake Oswego, OR 97035   (Clackamas County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Fitness Center, Paving/Reconstruction, Site Development, Swimming Pool(s)
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected March 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $30,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is under construction.

Details

34,060 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents