Similar Projects
Yorkfield Detention Basin Wall Detention Basin Wall Repairs - City of Elmhurst
Infrastructure
Conception
$250,000 est. value
Elmhurst, IL

Public Work Phase III and Other Improvements - City of Elmhurst
Renovation, Alteration
Conception
$2,475,000 est. value
Elmhurst, IL 60126

Blanchard Circle Mixed Use Buildings
New Construction, Infrastructure - 16,400 SF
Design
$4,000,000 CJ est. value
Wheaton, IL 60189

Poplar Creek Church Bartlett
New Construction, Infrastructure
Design
$1,800,000 CJ est. value
Bartlett, IL 60103

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Timberwoods Park Playground Equipment Installation
Renovation
Post-Bid
Addison, IL

Willowbrook High School North Tennis Court Reconstruction
Results
Villa Park, IL 60181

Willowbrook High School Track Surface Repairs
Results
Villa Park, IL 60181

Dash Downers Grove Apartments
New Construction, Infrastructure
Construction
$40,000,000 CJ est. value
Downers Grove, IL 60515

Tri-State Tollway (I-294) Roadway and Bridge Reconstruction
Infrastructure
Construction
$205,907,075 CJ est. value
Hinsdale, IL 60521

Lexington Trace Parcel Unit 3 Townhomes
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Naperville, IL 60540

Lexington Trace Parcel Unit 3 Townhomes
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Naperville, IL 60540

Fire Station #13 - C012 - City of Aurora
New Construction, Infrastructure
Conception
$7,091,600 CJ est. value
Aurora, IL 60502

Downtown Washington Street Bridge Rehabilitation - BR031- City of Naperville
Infrastructure, Renovation
Design
$3,125,000 CJ est. value
Naperville, IL 60540

Baseball Field Improvement
Renovation
Post-Bid
$1,030,000 est. value
Glen Ellyn, IL 60137

Last Updated 06/07/2023 05:04 PM
Project Title

2023 Centennial Skate Park Removals and Drainage

Physical Address View project details and contacts
City, State (County) Naperville, IL 60540   (DuPage County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Park/Playground, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $76,800 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes removal of existing skate equipment, concrete and fence, storm sewer installation, erosion control and other miscellaneous work for a complete project as shown in the Drawings and Specifications. Work must be conducted between July 5- July 28, 2023. All questions concerning this project or those concerning bidding requirements should be directed to Peggy Motta in writing to pmotta@napervilleparks.org . Questions will be received in writing only through 12:00PM, May 22, 2023. 1. A bid bond is not required for this project. 2. If a bid is accepted, a Labor & Material Payment Bond, payable to the Naperville Park District, for not less than one hundred (100%) percent of the contract amount will be required prior to beginning construction. A Performance Bond, payable to the Naperville Park District, for not less than one hundred (100%) percent of the contract amount will be required prior to beginning construction on all projects $50,000 or more, and may be required for projects $50,000 or less at the discretion of the Naperville Park District. Such bonds shall include the provision guaranteeing the faithful performance of the Prevailing Wage Act. The surety on the bond shall be a company that is licensed by the Department of Insurance authorizing it to execute surety bonds and the company shall have a financial strength rating of at least A- as rated by A.M. Best Company, Inc., Moody's Investors Service, Standard & Poor's Corporation, or a similar rating agency. 3. If a bid is accepted, the Contractor will be required to file a written substance abuse prevention program with the Owner for the prevention of substance abuse among its employees prior to the commencement of the work. Said program shall be available to the general public. Award of Contract: It is anticipated that the contract will be awarded in June. The Park District reserves the right to reject any non-responsive or non-responsible Bids or to reject all bids and waive any informality or technicality in any Bid in the interest of the Park District.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents