Similar Projects
6.892 Miles of Milling, Inlay and Plant Mix Resurfacing on SR 155 Beginning at SR 10 and Extending to SR 13
Infrastructure
Bidding
GA

1.166 Miles of Milling, Inlay and Plant Mix Resurfacing on SR 260 Beginning East of SR 42 (Moreland Ave) and Extending West of I-20 - SR 402
Infrastructure
Bidding
GA

Road and Stormwater Maintenance and Repair Services
Term Contract
Post-Bid
Dunwoody, GA 30338

2019 City of Decatur Resurfacing Project
Post-Bid
Decatur, GA

Southern Region Disaster Recovery Support BPA
Results

Asphalt Cement Cutback and Emulsified
Term Contract
Results
GA

Intersection Improvements on SR 12 at S. Hariston Rd (CR 51)
Infrastructure
Bidding
Redan, GA 30074

I-285 PIB Interchange Improvements
Post-Bid
GA

Capital Paving Resurfacing
Results
$2,454,471 est. value
Brookhaven, GA 30319

2021 City Of Decatur Resurfacing Project
Infrastructure
Bidding
Decatur, GA

T32 - Routine Maintenance Services - District 7
Term Contract
Post-Bid

2020 Street Resurfacing
Results
Less than $4,441,710 est. value
Tucker, GA 30084

Rock Chapel Road Paving Project
Post-Bid
$110,000 to $180,000 est. value
Lithonia, GA 30058

Street Resurfacing
Results
Tucker, GA

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

Last Updated 07/13/2021 03:56 PM
Project Title

I-285 / I-20 East Interchange Project

Physical Address View project details and contacts
City, State (County) GA   (DeKalb County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $534,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work include the reconfiguration of the I-285 at I-20 East Interchange and improvements along I-20 (Project). The Project will begin just west of the I-285 Overpass and will end just east of the Fairington Road Overpass. The Project will also include the addition of a westbound collector-distributor lane on I-20, auxiliary lanes on I-20 and I-285 Northbound, as well as bridge replacements and widenings. The Project shall not preclude the design and construction of the future I-20 express lanes (PI 0013913), the I-285 from I-20 to I-85 Eastside Express Lanes (0013914), and the Panola Road interchange reconstruction (PI 0002868) projects.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents