Similar Projects
Brownsville Transit Village - Phase V
New Construction - 99,854 SF
Conception
$26,711,893 est. value
Miami, FL 33142

Miami Freedom Park & Soccer Village
New Construction - 1,000,000 SF
Conception
$1,000,000,000 est. value
Miami, FL

Fifth Avenue Estates
New Construction
Design
Homestead, FL 33034

Bay Harbour Marina Village
New Construction - 30,000 SF
Design
$10,000,000 CJ est. value
Fort Myers Beach, FL 33931

Hallandale Oasis
New Construction, Build-Out - 93,910 SF
Sub-Bidding
$370,000,000 est. value
Hallandale, FL 33009

The Reserve at Jensen Beach
New Construction
Post-Bid
$21,250,000 est. value
Jensen Beach, FL 34957

The Reserve at Jensen Beach
New Construction
Post-Bid
$21,250,000 est. value
Jensen Beach, FL 34957

Esplanade On Palmer Ranch
New Construction
Construction
$10,000,000 CJ est. value
Sarasota, FL 34240

Hollywood East
New Construction, Build-Out
Construction
$48,650,000 est. value
Hollywood, FL 33020

San Sebastian Inland Harbor
New Construction - 50,118 SF
Conception
$80,000,000 est. value
Saint Augustine, FL

One Bayfront Plaza
New Construction - 3,300,000 SF
Design
$10,000,000 CJ est. value
Miami, FL 33139

Orange Avenue Apartments
New Construction, Demolition
Post-Bid
$11,000,000 est. value
Tallahassee, FL

Via Mizner
New Construction - 730,000 SF
Construction
$63,651,007 est. value
Boca Raton, FL 33432

Varadero
New Construction - 2,456,798 SF
Conception
$10,000,000 CJ est. value
Sunny Isles, FL

Peninsula Bay - Master Plan
New Construction
Design
Cortez, FL 34210

Last Updated 05/05/2021 08:44 AM
Project Title

Development of the North Ridgwood Drive Site and Former Nancesowee Hotel

Physical Address View project details and contacts
City, State (County) Sebring, FL   (Highlands County)
Category(s) Entertainment/Recreation, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The CRA is seeking proposals from qualified and experienced real estate developers interested in undertaking the development of the site located at 139 North Ridgewood Drive within the Sebring CRA District. The purpose of this solicitation is to continue implementation of the Community Redevelopment Plan by providing for the conveyance of the property owned by the CRA to the Developer selected for redevelopment to remove conditions of slum and blight, increase the tax base, enhance the quality of life, improve the aesthetics and useful enjoyment of the redevelopment area, and promote the health, safety, morals and welfare of the residents of the CRA and the City. Due to the importance of this particular downtown development site, it is the intention of the CRA to consider certain development “incentives” to assist in making the project feasible which might include, but not be limited to, conveyance of the property at no cost, the payment of certain impact fees, housing incentives, tax increment rebates, etc. If the developer wishes to request incentives, they must outline their request as part of the proposal. The now vacant parcel was home to the Nan-Cess-O-Wee Hotel, a 60-room historic hotel built in 1923 by Sebring’s founder, George E. Sebring. The hotel was one of the original buildings in the historical downtown area, but had been closed since 2004. Over the years, the building fell into disrepair and was eventually condemned. The building was recently acquired by the CRA and out of necessity, was demolished. The property is zoned C-1 commercial, and an existing planned development agreement is applicable to the property from the previous owner. The CRA would support a reasonable change in the zoning if requested as part of the proposal to maximize the development opportunity. The proposed structure’s facade design will be reviewed for approval by the CRA board, and the City’s Historic Preservation Commission. A key objective as part of the CRA’s redevelopment strategy for Downtown Sebring is the creation of a residential concentration in and around the downtown area to create the support for a day-into-evening retail, office, recreational and entertainment environment. There is a desire to provide market rate and workforce rental units to meet the county’s unmet housing demand. The CRA envisions this parcel as a major opportunity to facilitate this strategy. Additional goals include revitalization within the broader downtown area, promotion of pedestrian traffic use throughout the day and evening, as well as enhanced linkages to compatible development with current and planned commercial, retail, and recreational centers within the downtown area. Highlands county recently conducted a housing study to analyze the housing market and provide recommendations for addressing the need for more market-rate rental options. The study demonstrated that multi-family inventory has been stagnant the past five years with no new units or developments delivered in the county in recent years. The results of the study indicated a pent up demand for multi-family housing and the need for over 600 multi-family units. The full study will be provided as an addendum for reference.

Details

Apartments/Condominiums, New Construction, Clubhouse/Social Club, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents