Similar Projects
3900 Alton
New Construction, Build-Out - 197,780 SF
Conception
$10,000,000 CJ est. value
Miami Beach, FL 33140

3900 Alton
New Construction, Build-Out - 197,780 SF
Conception
$10,000,000 CJ est. value
Miami Beach, FL 33140

7918 West Drive
New Construction - 99,078 SF
Design
$5,000,000 to $10,000,000 CJ est. value
North Bay Village, FL

Publix #58 and Miracle Residences
New Construction, Demolition - 433,288 SF
Design
$81,500,000 est. value
Coral Gables, FL

Downtown Doral Lennar Residential
New Construction - 62,208 SF
Sub-Bidding
$5,000,000 to $10,000,000 CJ est. value
Doral, FL 33166

Lenscrafters
Renovation - 3,568 SF
Post-Bid
$200,000 est. value
Aventura, FL 33180

Lenscrafters at Macy's
Renovation - 1,065 SF
Post-Bid
Hialeah, FL 33012

Work Order Contract 2020- Central Area
Results
Less than $2,500,000 est. value
Miami, FL

Estates at Acqualina
New Construction - 2,178,600 SF
Construction
$558,000,000 est. value
Sunny Isles Beach, FL 33160

Arte By Antonio Citterio
New Construction - 150,000 SF
Construction
$90,000,000 est. value
Surfside, FL

Target
New Construction - 77,471 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Miami, FL 33010

Brickell World Plaza - Phase 2b & 2c
New Construction
Conception
$10,000,000 CJ est. value
Miami, FL

Miami Riverwalk Towers
New Construction - 3,678,706 SF
Design
$205,878,500 est. value
Miami, FL

Prequalification for the NMCRA Residential Rehabilitation Construction Program
Renovation
Post-Bid
North Miami, FL

Valencia Tower
New Construction
Construction
$26,000,000 est. value
Coral Gables, FL

Last Updated 07/16/2021 09:29 AM
Project Title

Wynwood 29

Physical Address View project details and contacts
City, State (County) Miami, FL   (Miami-Dade County)
Category(s) Commercial, Residential
Sub-Category(s) Apartments/Condominiums, Retail
Contracting Method
Project Status Construction Commenced July 2021
Bids Due View project details and contacts
Estimated Value $72,000,800
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

722,695 SF - Retail, Approximately 26,651 SF Build-Out, 2 Apartments/Condominiums, 8 to 12 Stories Above Grade, New Construction 248, 372, New Construction Parking Spaces.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents