Similar Projects
Bellaire Church Of Christ Parking Expansion
New Construction
Conception
Bellaire, TX 77401

Kroger #118-01 - Site Work Only
New Construction
Design
Spring, TX 77388

The Emery/Weiner School Parking Lot
New Construction - 80,000 SF
Design
Houston, TX 77025

Construction of the Bridgeland Convenyance Channel South of Creekland Village Section 1 and 2
Bidding
TX

Construction of Detention and Mass Grading for Sunterra Phase IB
Bidding
Houston, TX

Development and/or Redevelopment of 410/402 Pierce Street
Post-Bid
Houston, TX 77002

Imperial Heights Clearing & Grubbing
Post-Bid
Houston, TX

Core Drilling Services
Results

Geotechnical Drilling and Boring Services
Results

Air Center Distribution Center Detention Pond
New Construction
Construction
Houston, TX 77000

UPS Sweetwater
New Construction, Renovation, Demolition - 15,000 SF
Construction
$300,000 est. value
Houston, TX 77037

Almeda & Orem RV Resort
New Construction - 4,448 SF
Design
$3,700,000 est. value
Houston, TX 77045

Bastrop Baboon Corral Excavation
Post-Bid
Houston, TX

Fuller South Freeway Outfall Phase I
New Construction
Results
Houston, TX 77057

Villa D’Este Bayou Bank Planting & Amenities
Renovation
Construction
$669,020 est. value
Houston, TX 77056

Reported 02/10/2021 12:00 AM
Project Title

Reclaimed Water System For Cypress Creek Course & Jack Rabbit Course

Physical Address View project details and contacts
City, State (County) Houston, TX 77069   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status All Bids Received, Selection Underway
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of 12-inch Purple reclaimed water line, including bends and fittings .Installation of 16-inch steel casing, by trenchless construction, including fittings. Installation of 8-inch HDPE observation pipe, including bends and fittings. Installation of 12-inch meter with meter vault. Installation of 12-inch gate valve and box. Installation of 2-inch blowoff valve and box. Installation of 12-inch plug and clamp with a stake aboveground. Installation of Combination air/vacuum release valve with manhole, vent piping, and bollards. Installation of flushing valve and assembly, including 8-inch lead pipe and 8-inch gate valve. Installation of 12-inch butterfly valve, in a Aquavault vault. Installation of Type “C” precast concrete manhole, all depths, for HDPE observation pipe with bolted frame and Furnish and install new MOV control panel, motor feeders, instrumentation and appurtenances as needed, modifications to existing service rack, actuator vault and manhole electrical work, sump pump (including floats and plumbing to local drain), conduits, and conductors as necessary for a complete and functional system as described in specifications and plans for the Cypress Creek and Jack Rabbit courses. Site restoration following Champions Golf Club, Inc standards, including removing and replacing concrete sidewalks and pavement, damaged turf, plants, trees, and shrubs.

Details

Site Development.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents