Similar Projects
International School at Mesa Del Sol
New Construction - 1,089,000 SF
Design
$10,000,000 CJ est. value
Albuquerque, NM 87105

BIA DB New Dormitory at ATSA Biyaazh School
New Construction - 18,705 SF
Bidding
$5,000,000 to $10,000,000 est. value
Shiprock, NM 87420

Los Lunas Middle School Renovation
Renovation
Bidding
Los Lunas, NM 87031

Caton Middle School
Post-Bid
Eunice, NM 88231

On-Call Construction Contractor Services District-Wide
Term Contract
Post-Bid
Gallup, NM

Coyote Willow Family School Phase 2
Addition - 16,000 SF
Results
Albuquerque, NM 87114

El Molino Redevelopment Project Charter School
Results
Los Lunas, NM 87031

Los Alamos High School Fieldhouse Construction
Construction
Los Alamos, NM 87544

Construction of Desert Pride Kitchen Addition - 2019
Addition
Construction
Berino, NM 88021

Job Order Contract - General Construction
Post-Bid
Clovis, NM

Facility Improvement at Various School Sites
Results
Alamogordo, NM 88310

Rio Grande High School Title IX New Gym and Various Athletic Facility Renovations
Renovation
Construction
Albuquerque, NM 87105

Portable Classrooms
Post-Bid
Shiprock, NM 87420

Cimarron High School Locker Room Renovation
Renovation - 2,448 SF
Results
Cimarron, NM 87714

Construction of an Office/ Entry Addition to The Existing Multipurpose Building
Addition
Construction
Taos, NM 87571

Last Updated 07/29/2021 05:25 PM
Project Title

Mechanical Renovation for Artesia High School Gymnasium #3 HVAC Renovations

Physical Address View project details and contacts
City, State (County) Artesia, NM 88210   (Eddy County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition of all existing heating and cooling systems in their entirety. Demolition of ceiling and lights in the weight room, locker rooms, and coaches offices. Design new mechanical system which includes new RTU's and exhaust fans. Upgrade electrical service. Construct new ceilings and lights in weight room, locker rooms, and coaches offices. Upgrade flooring in girls locker room. Roof and wall repairs as needed.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents