Similar Projects
Westwood Country Club Redevelopment - Master Plan
New Construction, Demolition, Alteration
Conception
$300,000,000 to $800,000,000 est. value
Amherst, NY

West Lake Comfort Station New Foundation
Infrastructure
Bidding
Montauk, NY 11954

Bearcat Sports Complex Site Work for Turf Installation
Infrastructure
Bidding
Binghamton, NY 13902

2021 Capital Improvement Project: Phase 4 - Contract Contract 506: Site Contract
Infrastructure
Sub-Bidding
$700,000 est. value
Rochester, NY 14618

Trail 4 Improvements To The Nysdec West Almond Trail System 2021
Renovation
Post-Bid
Almond, NY 14804

Horizontal Directional Drilling - Term Construction Contract #6
Post-Bid
Rochester, NY

East Gym Fit Court Site Work and Lighting
Results
Binghamton, NY 13902

2019 CIP Phase 1 - Site Preparation
Results
Sodus, NY 14551

Maria College Campus Development
Renovation, Addition - 1,120 SF
Construction
$5,000,000 est. value
Albany, NY 12208

Daisy Barn Campground
New Construction
Construction
$1,600,000 est. value
Wilson, NY 14172

District Wide Reconstruction Project - Site Work Contractor
Infrastructure
Bidding
Saugerties, NY

Harrington Heights - Site Development
New Construction
Post-Bid
Poughkeepsie, NY 12601

Chili Fire Department Company 1 - Sitework
Results
Rochester, NY 14624

Aldi-McDonald's Pad Site
New Construction
Construction
Greenport, NY 12205

Taking Deep Land and Marine Borings Citywide
Infrastructure
Bidding
New York, NY

Last Updated 04/11/2022 02:31 PM
Project Title

Z1DA--528A8-18-806 D-Stream Upgrade Site Prep (VA-20-00005571)

Physical Address View project details and contacts
City, State (County) Albany, NY 12203   (Albany County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project 528A8-18-806 D-Stream Upgrade Site Preparation - Building 1, Stratton VA Medical Center (VAMC): provide and install a D-Stream Upgrade to the existing MRI. This upgrade will essentially replace all the MRI system s components excluding the magnet. During the Contractor s design, the Contractor shall review Philips supporting documentation and Scope of Work to verify the existing design is sufficient and accurate. These documents would serve as the 35% design. If there are missing or misleading pieces of information in the 35% design, the Contractor shall design and/or correct the information and inform the VA COR and Philips of the required changes. Once the design has been reviewed and approved by the VA COR and Philips, all three parties shall coordinate for the start of construction. During the Contractor's site preparation work/construction, the Stratton VAMC will send out its cases since the MRI will not be operational.

Details

Division 01 - General Requirements, Site Construction Performance Requirements, Site Preparation Performance Requirements.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Support Assemblies, Healthcare Metal Supports.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Service Walls, Patient Bed Service Walls, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Protective Covers.
Division 11 - Equipment, Mercantile and Service Equipment, Vending Equipment, Foodservice Equipment, Ice Machines, Cleaning and Disposal Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Operating Room Equipment, Solid Waste Handling Equipment.
Division 12 - Furnishings, Window Blinds, Casework, Furniture, Seating, Institutional Furniture, Healthcare Furniture.
Division 13 - Special Construction, Radiation Protection.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems, Healthcare Intercommunications and Program Systems, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Radiation Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents