Similar Projects
Install Emergency Cooling Tower Makeup Water
Design
$500,000 to $1,000,000 est. value
Cape Canaveral, FL 32925

SBDD High-Capacity, Mobile Stormwater Pumps Project
Infrastructure
Bidding
Southwest Ranches, FL 33331

Cypress Bridge Wellfield Improvements Project
Infrastructure
Bidding
Tampa, FL

Transfer Pump Replacement
Post-Bid
Less than $1,735,000 est. value
Hallandale, FL 33009

Purchase and Delivery of Grinder Pump with Accessories, Assembled, (Duplex Pump System)
Post-Bid
West Palm Beach, FL 33415

Replace Chiller and Pumps at USCG Sector Key West, Florida
Results
$250,000 to $500,000 est. value
Big Coppitt Key, FL 33040

New Well 16 Construction and Well 11 Abandonment
Results
Jacksonville Beach, FL 32227

Multi-Year Contract for Repair of Electrical Motors and Pumps
Term Contract
Bidding
Atlantic Beach, FL

Unit 5 52 Circulating Water Pump Overhaul at Mcintosh Power Plant
Post-Bid
Lakeland, FL 33805

Gibson Oaks Water Production Facility (WPF)
Results
Less than $13,214,000 est. value
Lakeland, FL 33809

As-Needed Well Drilling Construction, Rehabilitation and Repair Services
Term Contract, Infrastructure
Bidding
FL

SHIP Program Well and Septic Installation
Post-Bid
Macclenny, FL 32063

Repair Services for Pumps, Motors, and Other Equipment
Results
Kissimmee, FL 34741

Rehabilitation of Deep Injection Wells
Infrastructure
Bidding
$800,000 est. value
Miramar, FL 33025

Irrigation Well Replacement
Term Contract
Post-Bid
Land O' Lakes, FL 34639

Last Updated 09/22/2021 11:02 AM
Project Title

CDBG Revitalization Well 3

Physical Address View project details and contacts
City, State (County) Micanopy, FL   (Alachua County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing, delivering, and installing all materials, equipment, and services, including labor for the Work, which generally involves the following activities: The base bid consists of the construction of one 14-inch diameter Upper Floridian well at the Town of Micanopy Water Treatment Plant. The well construction will include performance testing, installation of a 750 gpm vertical turbine pump, 6-inch site piping with associated fittings, geophysical logging and packer testing of the existing 8-inch diameter well, improvements to the existing chemical system, and associated electrical control system improvements

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents