Similar Projects
ANR Stillwater Forcemain Replacement
Infrastructure
Post-Bid
$300,000 CJ est. value
Groton, VT 05046

ANR Stillwater Forcemain Replacement
Infrastructure
Post-Bid
$2,800,000 CJ est. value
Groton, VT 05046

Hinesburg Road Pump Station and Dorset Station Force Main - City of South Burlington
Renovation
Conception
$3,700,000 est. value
South Burlington, VT

Lane Press Pump Station and Force Main - City of South Burlington
Renovation
Conception
$1,550,000 est. value
South Burlington, VT

Pleasant Street Pump Station Replacement Project
New Construction
Results
$125,000 est. value
Brighton, VT 05846

Barre North End Pump Station Replacement
Infrastructure
Results
$200,000 est. value
Springfield, VT

Construction of The Killington Water Transmission Mains
Infrastructure
Post-Bid
$20,000,000 CJ est. value
Killington, VT 05751

Killington Vermont Water System Source, Pumping, Storage, and Transmission Main
Renovation, Infrastructure
Post-Bid
Killington, VT 05751

Neck of the Woods Renovation
New Construction, Renovation, Infrastructure - 7,548 SF
Pending Verification
$700,000 CJ est. value
Waitsfield, VT 05673

Retreat Pump Station Replacement - Contract 1
Demolition, New Construction, Infrastructure
Results
$856,100 CJ est. value
Brattleboro, VT 05301

BGS - Ascutney State Park Water Supply and Distribution Improvements
Renovation, Infrastructure
Results
$306,225 CJ est. value
West Windsor, VT 05089

Water System Improvements Contract No.2
New Construction, Infrastructure
Results
$1,581,565 CJ est. value
Bethel, VT 05068

Last Updated 05/25/2023 10:51 AM
Project Title

DESIGN AND INSTALLATION OF DUCTLESS HEAT PUMP MINI SPLIT SYSTEM

Physical Address View project details and contacts
City, State (County) Rutland, VT 05701   (Rutland County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2024
Bids Due View project details and contacts
Estimated Value $410,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Rutland is requesting proposals from experience contractors ("Contractor") to design and install a ductless heat pump mini split system in Rutland City Aldermen Chamber's. The purpose of this project is to provide heating and cooling, improve energy efficiency, reduce noise, and improve occupant comfort and air quality.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents