Similar Projects
Grates and Frames
Post-Bid
Mobile, AL 36633

2021 Annual Contract for Cured-In-Place Pipe Rehabilitation of the Public Portion of Sanitary Sewer Laterals
Post-Bid
Less than $400,000 est. value
Mobile, AL 36618

CWSRF Contract 48" Force Main from Eslava Lift Station to Williams WWTF Phase 3-1A Materials
Results
Less than $4,300,000 est. value
Mobile, AL 36618

1500 Azalea Road Emergency Sewer Repair
Results
Less than $100,000 est. value
Mobile, AL 36693

2021 Annual Contract for Manhole Rehabilitation
Post-Bid
Mobile, AL 36618

MA-Grease Trap Pumping and Jetting Services for DOC
Results
Alexander City, Alpine, Atmore, Bessemer, Birmingham, Brent, Camden, Clayton, Clio, Deatsville, Decatur, Elmore, Hamilton, Harvest, Loxley, Montgomery, Prichard, Springville, Union Springs, Wetumpka, AL 36551

2021 Annual Contract to Install and Replace Sewer Laterals and Related Sewer Mains Located within Right-of-Ways
Post-Bid
Mobile, AL 36618

City Wide Manhole Installation Project
Results
Less than $744,000 est. value
Mobile, AL

2021 Annual Contract for Cleaning and Video Inspection of Various Sanitary Sewer Segments
Term Contract
Post-Bid
Mobile, AL

Hillsdale Sewer Improvements
Results
Less than $236,370 est. value
AL

Access Roads Annual Contract 2021 Construction and Sewer Easement Maintenance
Term Contract
Post-Bid
Mobile, AL 36618

Shelton Beach Estates Sanitary Sewer Improvements
Results
Less than $154,443 est. value
Saraland, AL 36571

2019 CDBG Sewer Rehabilitation Project
Post-Bid
Chickasaw, AL

Duncan Street Water and Sewer Improvements
Results
Mobile, AL 36618

Manhole Rehabilitation at Saraland Wastewater Treatment Plant
Post-Bid
Saraland, AL

Last Updated 08/06/2021 08:50 AM
Project Title

Eslava Creek Force Main Replacement - Phase 2

Physical Address View project details and contacts
City, State (County) Mobile, AL 36628   (Mobile County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $15,137,460
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes, but is not limited to the following: The construction of approximately fifteen thousand (15,000) linear feet of thirty-six inch (36") sanitary sewer forcemain, bypass/crossover connections of the existing 48" PCCP to the new 36" forcemain, approximately 2,000 linear feet of steel encasement installation, including multiple railroad crossings, major streets and storm drain infrastructure with 54" steel encasement installations. The project is located on the west side of Perimeter Road, continues north on the west side of Perimeter Road then runs easterly along the south side of Perimeter Rd., then northerly along the west side of Michigan Avenue, bore under Michigan Avenue and to the north along an easement south of Michigan and crossing under 3rd Street, then easterly along the south side of Avenue C, then to the north on the west and east sides of 6th Street. After crossing the culvert and railroad tracks, the project runs east then north along 6th Street through the north portion of the MAA property crossing CSX Railroad, then east crossing Duval St. then south along the west side of Nellie Street to tie to Phase 3 at Broad Street.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents