Similar Projects
Air Park Recreation Center Replacement Facility - City of Lincoln
Addition, Infrastructure
Conception
$933,182 CJ est. value
Lincoln, NE 68524

Multi Modal Center - City of Lincoln
New Construction, Infrastructure
Conception
$528,979 CJ est. value
Lincoln, NE 68508

Compressed Natural Gas (CNG) Fueling Station
New Construction, Infrastructure
Design
$4,481,919 CJ est. value
Lincoln, NE 68508

Nebraska State College System 1233 Lincoln Mall
New Construction, Build-out, Renovation, Infrastructure - 7,600 SF
Bidding
$3,000,000 CJ est. value
Lincoln, NE 68508

Northeast Antelope Creek Bank Repair
Infrastructure
Bidding
$100,000 CJ est. value
Lincoln, NE 68506

I-80, Utica - Lincoln
Infrastructure
Post-Bid

Bus Stop Improvements Design Work-StarTran
New Construction, Infrastructure
Post-Bid
Lincoln, NE

Subdivision Chip Seal 2021
Alteration
Results
Firth, NE 68527

2021 Sidewalk and Ramp Rehabilitation
Infrastructure
Results
Lincoln, NE

17th & Holdrege Transformer #2 - SUB410 - City of Lincoln
New Construction, Infrastructure
Pending Verification
$3,204,000 CJ est. value
Lincoln, NE 68508

Google Data Center at Lincoln Data Center
New Construction, Infrastructure - 2,000,000 SF
Pending Verification
$600,000,000 CJ est. value
Lincoln, NE 68507

20th & Pioneers Substation Replace Transformer - 0693 - City of Lincoln
New Construction, Infrastructure
Conception
$1,064,000 CJ est. value
Lincoln, NE 68502

University of Nebraska-Lincoln Varner Hall-South Entry Exterior Concrete Replacement
Infrastructure
Bidding
$200,000 CJ est. value
Lincoln, NE 68583

Rousseau Elementary School Parking Improvements
Infrastructure
Post-Bid
Lincoln, NE 68506

2021 SE Priority Sidewalk Repair Project
Infrastructure
Results
Lincoln, NE

Last Updated 10/04/2022 05:06 PM
Project Title

Arnold Heights Concrete - 2022

Physical Address View project details and contacts
City, State (County) Lincoln, NE 68508   (Lancaster County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $30,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of removing and replacing existing 4" thick concrete walk and patios, concrete stoop, and 5" concrete driveway. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All work is to be completed prior to November 1, 2022. Removal of existing concrete walks, drives, private streets, and other items to be replaced; 2) All other items which must be removed to complete work as described in the Drawings and these Specifications No bonds are required for this proposal, either Bid Bond or Performance and Labor and Material Bond.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents