Similar Projects
Cedar Hammock CDD Lake Bulkhead and Bridge Replacement and Repair
Results
$3,143,368 est. value
Naples, FL

Mooring Line Drive Bridge Repairs
Bidding
Naples, FL 34102

Bridge Replacement - Bridge Package D-1 Bridge-Immokalee Road
Bidding
$2,200,000 est. value
FL

Park Shore and Galleon Drive Bridge Repairs
Results
Less than $63,000 est. value
Naples, FL 34102

Pedestrian Bridge, Ochopee, FL
Results
Ochopee, FL 34141

Gator Canal Bridge Replacement
Results
Less than $1,450,000 est. value
FL

Galleon Drive Bridge Rail Timber Cladding and Hardieplank Replacement
Results
Naples, FL

R and R Intermediate Bridge
Results
Less than $1,241,200 est. value
FL

Bridge Replacement - Bridge Package A - 2 Bridges - Imm Road
Post-Bid
Less than $4,400,000 est. value
FL

Bridge Replacement-Bridge Pkg B-4 Bridges Immokalee Road Countyline Road
Post-Bid
Less than $8,800,000 est. value
Naples, FL

Bridge Replacement - Bridge Package C - 4 Bridges Oilwell Road
New Construction
Post-Bid
$13,200,000 est. value
FL

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Bidding

Construction of the Palm River Bridge Replacement Project
Results
Less than $1,665,000 est. value
Naples, FL 34112

Peace Way Bridge Over Drainage Ditch Repair
Results
Less than $30,000 est. value
FL

Design Build-Step 1-Golden Gate Pkwy over Santa Barbara Canal Bridge Replacement
Post-Bid
Less than $5,200,000 est. value
FL

Last Updated 03/31/2020 11:09 AM
Project Title

Peace Way Over Drainage Ditch Bridge Repairs

Physical Address View project details and contacts
City, State (County) FL   (Collier County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Bridge having numerous delamination and spalling on the precast concrete sections including erosion around the wing wall footings. Includes concrete restoration work of an existing concrete bridge structure and deck, including but not limited to restoration of corroded reinforcing steel and supplementing existing reinforcing steel with new reinforcing steel as required, restoration of delaminated, deteriorated, spalled and unsound concrete, and patching as required, and all necessary equipment, labor and materials required to complete the work. Lump sum cost includes the removal of dirt and vegetation at both bridge fascias along the joint between barrier and top slab. Lump sum cost includes rebars and cost of excavation/backfill excavated material may be used for backfill.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents