Similar Projects
HVAC Services
Term Contract
Post-Bid
Reno, NV

UNR - Maintain the Fume Hood Exhaust System
Alteration
Results
$72,000 to $132,000 est. value
Reno, NV

Heating and Cooling Replacement on C Building at Lemmon Valley Elementary School
Alteration
Results
$390,000 est. value
Reno, NV 89506

Air Handler Replacements - Phase I at Edward C. Reed High School
Alteration
Results
$3,200,000 est. value
Sparks, NV 89434

Replacement of Boiler/Cooling Tower and Heat Pumps at Agnes Risley Elementary School
Alteration
Results
$1,883,000 est. value
Sparks, NV 89431

Unr - Install Replacement Heat Exchanger And Control Valves
Term Contract
Results
$100,000 to $200,000 est. value
Reno, NV 89512

Chiller Replacement Reno
Renovation
Post-Bid
$500,000 CJ est. value
Reno, NV 89502

UNR - Replace Pumps and Valves in Fleischmann Agriculture and Life Science Mechanical Room
Alteration
Post-Bid
$55,000 to $115,000 est. value
Reno, NV

One (1) New Outdoor Custom Air Handling Unit (AHU or Equipment) for the Ticketing Hall Expansion (Project) at the Reno-tahoe International Airport (Rno)
Alteration
Post-Bid
$1,000,000 est. value
Reno, NV 89502

District-Wide HVAC Repairs
Renovation
Post-Bid
$200,000 CJ est. value
Reno, NV 89501

University of Nevada-Reno - Replace Paul Laxalt Mineral Research Computer Room Chiller
Renovation
Post-Bid
$110,000 CJ est. value
Reno, NV 89557

HVAC Replacement at Student Health Services Building
Renovation
Post-Bid
$246,600 CJ est. value
Sparks, NV 89431

Washoe County Jan Evans Facility - Fire Smoke Damper Actuator Replacement
Renovation
Post-Bid
$125,000 CJ est. value
Reno, NV 89512

HVAC Replacement - Alf Sorensen Lobby & Preschool
Renovation
Results
$780,000 CJ est. value
Sparks, NV 89431

Replacement of Rooftop Units at Roy Gomm Elementary School
Renovation
Bidding
$1,352,500 CJ est. value
Reno, NV 89519

Last Updated 05/22/2023 05:05 PM
Project Title

California Building HVAC System Upgrade

Physical Address View project details and contacts
City, State (County) Reno, NV 89509   (Washoe County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

PN-147022, 22_089 Said Proposal shall include all labor, tools, implements, machinery, materials, and any incidentals necessary to complete the work in the manner and time prescribed, and in strict conformity with the Contract Documents to the satisfaction of the City Engineer. In general, the major work items include: 1) removal of existing HVAC equipment, which includes, but is not limited to two interior wall mounted heaters, one exterior wall mounted air conditioner, and one boiler), and repair (patch and paint) the walls where equipment is removed; 2) installation of new mechanical HVAC system consisting of new condensers, air handlers, louvers, ductwork, controls, and sensors; 3) installation of new electrical service to support HVAC upgrades; 4) installation of security fencing and concrete equipment pads; and 5) perform any other miscellaneous work as outlined in the plans and specifications. Online Q&A : Yes Q&A Deadline : 05/16/2023 5:00 PM (PDT) Project Duration : 125 Calendar Days The contact person for this project is Frank Avera, Facilities Manager, with the City of Reno, and may be reached at (775) 399-5599, btsadmin@reno.gov.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents