Similar Projects
On Call Construction Administration and Inspection Services
Alteration
Bidding
Charlotte, NC

Engineering - Belmont Lift Station and Forcemain
Infrastructure
Bidding
$36,110,000 est. value
Charlotte, NC

Vertical Region 4- Regional Architect and Engineering Indefinite Delivery Indefinite Quantity Contracts
Post-Bid
$100,000 to $30,000,000 est. value

Roofing Design Services Associated Engineering Services Packet 2
Post-Bid
Charlotte, NC 28208

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

Terminal Lobby Expansion and Central Energy Plant Special Inspections and Material Testing
Construction
$600,000,000 est. value
Charlotte, NC

Engineering - Brier Creek Outfall, and Walnut Creek Interceptor Phase 3
Infrastructure
Bidding
$3,493,396 est. value
Charlotte, NC

Engineering, Planning and Development
Post-Bid

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

Design - Atkins Library Tower ADA and Fire/Smoke System Upgrades
Alteration
Bidding
$13,800,000 est. value
Charlotte, NC 28223

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Post-Bid
Less than $45,000,000 est. value
Washington, DC

Cameron Second Floor Renovation - Design Services
Results
Charlotte, NC 28223

Engineering - Dana's Branch Stream Restoration
Infrastructure
Bidding
$380,000 est. value
Cornelius, NC

Qualifications-Based Selection for a Pool of Architectural/Engineering
Post-Bid
Charlotte, NC

Reported 07/07/2022 12:00 AM
Project Title

Engineering - Information Session West Boulevard Relocation and 4th Parallel Runway

Physical Address View project details and contacts
City, State (County) Charlotte, NC 28208   (Mecklenburg County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Accepting Qualifications, Construction Start Expected July 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Charlotte Douglas International Airport ("CLT" or "Airport"), which is owned and operated by the City of Charlotte, North Carolina, is seeking statement of qualifications ("SOQ") from qualified and experienced firms (individually or collectively, the "Firm") interested in providing Civil Engineering Services for West Boulevard Relocation, and 4th Parallel Runway Project. This project is associated with the Airport's 4th Parallel Runway Project. West Boulevard will need to be relocated to Piney Top Drive and Byrum Drive in order to create space for the 4th Parallel Runway and South End-Around Taxiway. Intersection improvements and roadway widening will occur at various locations along the corridor. This program includes the planning, design, and construction of a 10,000-foot parallel runway and associated taxiway system to include the North End Around Taxiway Phase II and South End Around Taxiway. The 2016 Airport Capacity Enhancement Plan and 2018 FAA-approved forecast show the need for an additional runway at CLT. This runway will replace the existing crosswind runway and enhance capacity as the parallel configuration will provide greater operational benefit for more efficient air traffic flow into and out of CLT.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents