Similar Projects
Pierce 1 Marina
New Construction, Build-Out - 109,650 SF
Conception
$26,174,800 est. value
Fort Pierce, FL 34950

Crystal Lagoon
New Construction
Conception
FL

Riverside Wharf
New Construction - 400,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Miami, FL

Bahia Mar - Master Plan
New Construction - 1,970,000 SF
Design
$412,000,000 est. value
Fort Lauderdale, FL 33316

Develop a City Marina
New Construction
Post-Bid
West Palm Beach, FL

City of Maitland Fort Maitland Park Renovation
Renovation
Post-Bid
Maitland, FL 32751

Ellie Schiller Homosassa Springs Wildlife State Park - Boat House
Results
Homosassa, FL

Development of Waterway Estates Property
New Construction
Results
Fort Myers, FL 33903

Bay Harbour Marina Village
New Construction
Construction
$10,000,000 CJ est. value
Fort Myers Beach, FL 33931

Boca Beach House Luxury Residences & Marina
New Construction
Construction
$43,312,253 est. value
Boca Raton, FL 33432

Mirada Crystal Lagoon
New Construction - 27,352 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Wesley Chapel, FL

Meridian Marina
Renovation, Addition - 62,000 SF
Pending Verification
Palm City, FL 34990

Crystal Lagoon
New Construction, Infrastructure
Conception
FL

Paradise Isle
New Construction, Renovation - 100,000 SF
Design
$600,000,000 to $1,000,000,000 est. value
North Fort Myers, FL

Ouanalao Resort
New Construction, Build-Out, Infrastructure - 165,646 SF
Post-Bid
$10,000,000 CJ est. value
Jensen Beach, FL 34957

Last Updated 02/24/2022 12:00 AM
Project Title

US Sailing Center

Physical Address View project details and contacts
City, State (County) Jensen Beach, FL 34957   (Martin County)
Category(s) Entertainment/Recreation
Sub-Category(s) Beach Facility/Marina
Contracting Method
Project Status Construction Commenced June 2020, Construction Complete as of September 2021
Bids Due View project details and contacts
Estimated Value $352,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project to include a two story addition to the existing building, add boat storage and construct an exfiltration system within the existing dry retention area and add a shed to the existing Sailing Center development. Also proposed is a 76 stall grass parking area within the park area to the south for overflow parking use.

Details

1 Beach Facility/Marina, 2 Stories Above Grade, 1,586 SF Addition, 5 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Heavy Timber Construction, Heavy Timber Pier Construction.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings.
Division 09 - Finishes, Tiling.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Lockers.
Division 26 - Electrical, Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Access Control, Security Access Detection.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents