Similar Projects
2022 Lighthouse Dr Reconstruction
Infrastructure
Design
$892,265 CJ est. value
Fond du Lac, WI 54935

River Point District - Phase II (Street & Utilities)
Infrastructure
Bidding
$9,300,000 CJ est. value
La Crosse, WI 54601

Underground Utilities Installation - GC
Infrastructure
Bidding
$1,500,000 CJ est. value
Madison, WI 53704

Appleton Public Library - BU 03B Concrete Topping
New Construction, Infrastructure
Sub-Bidding
$160,000 CJ est. value
Appleton, WI 54911

Appleton Public Library - BU 03A Building Concrete
New Construction, Infrastructure
Sub-Bidding
$30,000 CJ est. value
Appleton, WI 54911

Concrete at Large 2021
Post-Bid
Marinette, WI

Redi-Mix Concrete
Post-Bid
Madison, WI

Concrete Maintenance and Replacement
Term Contract
Results
Appleton, WI

Oak Creek Skate Park
Results
Oak Creek, WI 53154

Entrance and Terrace Renovation University Center University of Wisconsin - River Falls - GPC
Renovation
Construction
$359,817 CJ est. value
River Falls, WI 54022

Install Storm Sewer Piping
Infrastructure, Renovation
Construction
$178,689 CJ est. value
Fort McCoy, WI 54656

USDA Office Remodeling at Winnebago County Coughlin Center
Build-out
Bidding
$860,000 CJ est. value
Oshkosh, WI 54901

Castings
Term Contract
Post-Bid
Madison, WI

Poured-in-Place Resilient Surfacing
Results
Waukesha, WI

Auditorium Concrete Floor Polishing - Ronald Reagan High School
Alteration
Post-Bid
Milwaukee, WI 53221

Last Updated 08/26/2022 05:03 PM
Project Title

2022 Water Main Rehabilitation

Physical Address View project details and contacts
City, State (County) Mount Horeb, WI 53572   (Dane County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $941,630 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Estimate of Principal Items Water Main 2,160 LF Hydrants 9 EACH Water Service Connections 42 EACH Concrete Curb & Gutter 320 LF Bituminous Pavement 1,750 SY Plan Holders are required to designate whether they are a prime contractor, subcontractor, or supplier, which will be posted on the project Plan Holders List. All bidders must include a Statement of Bidder's Qualifications with sealed Bids. Bidders who submit a bid must be a Plan Holder of record at the issuing office. Bids from Bidders not on the Plan Holders List may be returned as being not responsive. Each bid must be accompanied by a Bid Bond equal to at least 10% of the maximum bid as a guarantee that if the bid is accepted, the Contractor will, within 10 days of receipt of the Notice of Award, furnish the Owner with a Performance and Payment Bond equal to the Contract price. The Village of Mount Horeb reserves the right to reject any and all bids, to waive any technicality, and to accept any bid that it deems advantageous. All bids shall remain subject to acceptance for forty-five (45) days after the time set for bid opening. The Contract award shall be made based on the lowest responsive and responsible Bidder.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents