Similar Projects
Bon Air Housing Units Roof Replacement
- 79,526 SF
Bidding
Bon Air, VA 23235

Z1DA--Building 514 Roof Repair (VA-21-00046652)
Bidding
Richmond, VA 23249

Lewis F. Powell Jr. U.S. Courthouse Exterior Envelope Renovation
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
Richmond, VA 23219

Roofing and Repair Service
Term Contract
Post-Bid

Roof Replacement Thomas Dale High School
Results
Less than $576,587 est. value
Chester, VA 23831

Z--MAWA - Porch Roof Repairs
Results
$100,000 to $250,000 est. value
Richmond, VA 23219

Roof Replacement at Chester Early Childhood Learning Academy
Bidding
$250,000 est. value
Chester, VA 23831

VMFA Pauley Center Re-Roofing Project
Post-Bid
Richmond, VA

Replace Roof WH44
Results
$1,000,000 to $5,000,000 est. value
Richmond, VA 23113

Roofing Envelope Services
Post-Bid

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Roofing MACC
Post-Bid

JSRCC-D Roof Replacement Academic Building
Results
Richmond, VA

Roofing Repair and Maintenance
Post-Bid

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Last Updated 07/14/2020 04:46 PM
Project Title

Roof Replacement at J.B. Fisher and Bellevue Elementary Schools

Physical Address View project details and contacts
City, State (County) Richmond, VA 23223 (Chesterfield, Richmond City Counties)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of the existing shingles, asphalt and Geogard and replacement with a conventional low slope EPDM fully adhered roof system multiple-ply insulated membrane system, including felt and sheeting metal flashings, intended for weather exposure as primary roofing at the J.B. Fisher and a cold fluid-applied hybrid roofing systems on metal deck at Bellevue Elementary Schools in Richmond, Virginia. Replacement includes all labor, material, equipment, and all accessories and components required for a complete and functional roof system. Completion date shall be on or before August 22, 2020.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents