Similar Projects
Sanitary Sewer Rehabilitation - Barry Rose Service Area (BR-04) - WW2301 - City of Pearland
Infrastructure
Conception
Less than $3,800,000 est. value
Pearland, TX

Street Reconstruction - Sherwood - TR2302 - City of Pearland
Infrastructure
Conception
$4,300,000 est. value
Pearland, TX

The Landing at Pearland Clubhouse and Amenities
New Construction, Infrastructure - 4,767 SF
Design
$1,000,000 est. value
Brookside Village, TX 77581

Brazoria County MUD 31 Phase One Amenity Improvements
New Construction, Alteration - 47,000 SF
Design
$510,000 est. value
Iowa Colony, TX

Freeport Harbor Channel Improvement Project, Texas, Reach No. 1, Reach No. 2 and Reach No. 4 in Brazoria County, Freeport
Infrastructure
Bidding
$250,000,000 CJ est. value
Freeport, TX 77541

Construction of Beechwood Chemical Building
New Construction, Infrastructure
Post-Bid
$130,000 CJ est. value
Lake Jackson, TX 77566

Construction of Beechwood Chemical Building
New Construction, Infrastructure
Post-Bid
$130,000 CJ est. value
Lake Jackson, TX 77566

Manvel Town Center Water Line Interconnect
Results
Manvel, TX 77578

Downtown Revitalization / Phase 3
Infrastructure
Results
$7,370,000 est. value
Lake Jackson, TX

SH 36 - Widen Road - Add Lanes
Infrastructure
Construction
$113,599,269 CJ est. value
Damon, TX 77430

SH 36 - Widen Road - Add Lanes
Infrastructure
Construction
$113,599,269 CJ est. value
Damon, TX 77430

Buffalo Wild Wings - 9005 Broadway Street - Pearland, TX
Renovation, Infrastructure - 6,500 SF
Pending Verification
$100,000 CJ est. value
Pearland, TX 77584

Lake Jackson Apartments Renovation
Renovation, Infrastructure
Pending Verification
$8,000,000 CJ est. value
Lake Jackson, TX 77566

Water Line Improvements Phase 6 - Wa2301 - City Of Alvin
Alteration
Conception
$2,160,600 est. value
Alvin, TX 77511

Alvin C-Store
New Construction, Infrastructure - 7,125 SF
Design
$2,137,500 CJ est. value
Alvin, TX 77511

Last Updated 11/17/2022 10:31 PM
Project Title

Water, Sanitary Sewer and Drainage Facilities and Paving and Appurtenances

Physical Address View project details and contacts
City, State (County) Angleton, TX 77515   (Brazoria County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $6,988,579 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work of the Contract includes the following: construction of water, sanitary sewer and drainage facilities and paving and appurtenances. Each Bid must be accompanied by a Bid Bond or a certified or cashier's check, acceptable to the Owner, in an amount not less than five percent (5%) of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract and execute the Bonds on the forms provided, and provide the required insurance certificates within seven (7) days after the date Contract Documents are received by the Contractor. If a certified or cashier's check is provided, the successful bidder shall deliver, at the bid opening address, the original certified or cashier's check within twenty-four (24) hours of receipt of the bid opening. The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except time of submitting a Bid. The Successful Bidder, if any, will be the responsible Bidder which in the Board's judgment will be most advantageous to the District and result in the best and most economical completion of the Project. Multiple Locations Are Available In This Project. Project number 21.14.309

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents