Similar Projects
SR 528 from east of SR 524 (Industry Road) to east of SR 3 - Florida Department of Transportation
Demolition, New Construction, Infrastructure
Pending Verification
$222,000,000 CJ est. value
Cocoa, FL 32926

SR 528 from east of SR 3 to Port Canaveral Interchange - Florida Department of Transportation
Demolition, New Construction, Infrastructure
Pending Verification
$349,000,000 CJ est. value
Cocoa, FL 32926

Las Olas Loop
New Construction
Design
$60,000,000 est. value
Fort Lauderdale, FL

Emerald Trail Master Plan Improvements
Infrastructure
Pending Verification
$336,237 CJ est. value
Jacksonville, FL 32202

RFQ D/B - Renewable Energy Initiatives Design-Build
New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Tampa, FL 33602

Phase II Repairs to Lake Manatee Dam
Renovation
Results
$20,000,000 est. value
Bradenton, FL

Central Everglades Planning Project (CEPP) South Contract 1 L-67a Structures (S-631, S-632, and S-633), Spoil Pile Removal and L-67C Gap Project, Miami-Dade County
Infrastructure
Post-Bid
$100,000,000 CJ est. value
Miami, FL 33173

RFQ Contractor - Central Everglades Planning Project (CEPP) Contract 11B, EAA A-2 Reservoir Embankment and Outlet Works, Palm Beach County, Florida
Infrastructure
Post-Bid
$1,000,000,000 CJ est. value
South Palm Beach, FL 33480

Purchase and Install Eastmonte Park Covered Batting Tunnel Synthetic Turf
Infrastructure
Post-Bid
$20,000 CJ est. value
Altamonte Springs, FL 32701

Last Updated 09/04/2023 06:32 AM
Project Title

Repair Reservoir Cover and Install Filtration System, Fort Pierce, FL (Picos Road Farms)

Physical Address View project details and contacts
City, State (County) Fort Pierce, FL 34945   (Saint Lucie County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Agency's Affiliate - 06/07/23
Owner View project details and contacts
Architect View project details and contacts
Description

The USDA, Agricultural Research Service, U.S. Horticultural Research Laboratory (Picos Road Farms) in Fort Pierce, FL requires repairs to existing reservoir cover and installation of a filtration system to an existing pump system. PROJECT INFORMATION PROJECT TITLE: Repair Reservoir Cover and Install Filtration System PROJECT LOCATION: Fort Pierce, FL NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM CODE: (NAICS): 237110 SMALL BUSINESS SIZE STANDARD: $45M Information concerning the REE policies and procedures regarding the definitization of equitable adjustments for change orders under construction contracts and the time required for definitization of those actions per 15 U.S.C. 644 is available at https://www.ars.usda.gov/afm/apd/acquisitions/. All questions must be submitted via email to osvaldo.rodriguez@usda.gov NLT 10:00 AM ET, June 28, 2023.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents