Similar Projects
CTH D Const / Intersection Modification
Infrastructure
Conception
$500,000 CJ est. value
Waukesha, WI 53189

CTH D Const / Intersection Modification
Infrastructure
Conception
$500,000 CJ est. value
Waukesha, WI 53189

Tailored Label Products New Industrial Building
New Construction - 82,200 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Menomonee Falls, WI 53051

Stor-It Right Storage Facility / Pabst Farms Commerce Center
New Construction, Infrastructure - 122,000 SF
Design
$13,000,000 CJ est. value
Oconomowoc, WI 53066

John & Lavinia Rockwell Park Phase 1 Construction
Infrastructure
Bidding
$480,000 CJ est. value
Oconomowoc, WI 53066

John & Lavinia Rockwell Park Phase 1 Construction
Infrastructure
Bidding
$480,000 CJ est. value
Oconomowoc, WI 53066

Town Hall Drive Reconditioning
Renovation
Post-Bid
Eagle, WI

Asphalt Concrete Paving - County Highway System
Infrastructure
Post-Bid
WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Local Road Maintenance
Results
WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

National Heritage Academies / Waukesha
New Construction, Infrastructure - 45,000 SF
Pending Verification
$9,500,000 CJ est. value
Waukesha, WI 53189

Brookfield Square Mall
Demolition, New Construction, Infrastructure - 370,000 SF
Pending Verification
$81,000,000 CJ est. value
Brookfield, WI 53005

Quiet Wood
New Construction, Infrastructure
Conception
$66,000,000 CJ est. value
Menomonee Falls, WI 53051

Last Updated 09/28/2022 01:06 PM
Project Title

ABB Inc. Headquarters

Physical Address View project details and contacts
City, State (County) New Berlin, WI 53146   (Waukesha County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $161,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 28, 2022, Construction is underway. A general contractor has been selected. Construction began March 2022 and be complete by October 2023.

Details

301,320 SF - 301,320 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents