Similar Projects
West Loop Phase II - FP067 - City of Davenport
Infrastructure, Alteration
Conception
$722,938 est. value
Davenport, IA 52801

Pedestrian Curb Ramp Retrofit Program
Infrastructure
Bidding
$300,000 CJ est. value
Davenport, IA 52801

Mound Street Pavement Resurfacing Project
Infrastructure
Bidding
$300,000 CJ est. value
Davenport, IA 52803

All Inclusive Swing at Vander Veer Park
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Davenport, IA 52803

Supplemental Community Water Source - Well at Genesis East
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Davenport, IA 52803

Sump Pump Abatement Project
Term Contract, Infrastructure
Post-Bid
$20,000 CJ est. value
Davenport, IA 52801

Auxiliary Site Clearing
Demolition, Alteration
Results
Davenport, IA 52802

Revetment
Infrastructure
Results
IA

Middle Road Pedestrian Bridge - City of Bettendorf
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Bettendorf, IA 52722

Youth Justice & Rehabilitation Center
New Construction, Infrastructure - 64,000 SF
Bidding
Davenport, IA 52807

Scott Community College - Belmont Campus Allied Health Wing CTE Addition and Remodel
Addition, Demolition, Build-out, Infrastructure
Post-Bid
Riverdale, IA 52722

Forest Grove Drive Roadway Light Poles
Alteration
Results
Bettendorf, IA 52722

2022 Commercial Alley Resurfacing Program
Infrastructure
Bidding
$200,000 CJ est. value
Davenport, IA 52801

Emeis Bunkers Renovation Phase 3
Infrastructure
Post-Bid
$50,000 CJ est. value
Davenport, IA 52804

Bicentennial Park Emergency Access
Infrastructure
Results
$110,000 CJ est. value
Riverdale, IA 52722

Last Updated 08/05/2022 08:38 AM
Project Title

Traffic Signal Improvements - Equipment Installation

Physical Address View project details and contacts
City, State (County) Le Claire, IA 52753   (Scott County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor and materials to install controllers and associated items for radar detection for the traffic signals (3) on Cody Road, utilize existing cabinets at the I-80 interchanges and provide a new cabinet on the existing base at the Eagle Ridge intersection. Signal equipment and shielded Cat 5 cable will be provided by the City of LeClaire. Removal and demolition of the existing controller equipment and camera detection system from mast arms is included in this contract. The work under the contract shall commence within ten (10) days of the written Notice to Proceed and all work shall be completed by December 1, 2022.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.
Division 34 - Transportation, Roadway Signaling and Control Equipment, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents