Similar Projects
Repairing, Maintaining and Installing Concrete on Runways, Taxiways, Ramps, Roadways and other Surfaces
Infrastructure
Bidding
Cleveland, OH

Runway 22R Pavement Repair
Post-Bid
Wilmington, OH

Springfield-Beckley Municipal Airport Repair Runway 06-24 (Joint and Crack Sealing)
Post-Bid
Less than $130,913 est. value
Springfield, OH

Taxiway "A2" Extension
Results
Less than $506,177 est. value
Urbana, OH 43078

MRT Taxiway Rehabilitation and Lighting
Results
Less than $631,266 est. value
Marysville, OH 43040

Construct Apron C Expansion at Port Bucyrus-Crawford County Airport
Post-Bid
Less than $120,000 est. value
OH

North Airfield Improvements Project Phase IV Sierra/Juliet
Results
$15,079,369 est. value
Cleveland, OH 44114

Rehabilitate Taxiway C at Port Bucyrus-Crawford County Airport
Post-Bid
Less than $95,000 est. value
OH

Rehabilitate Taxiway N Project
Results
Less than $978,316 est. value
Toledo, OH

Airport Apron and Taxiway B Reconstruction
Post-Bid
$5,048,711 est. value
Cleveland, OH 44115

Akron Fulton Airport Runway 7-25 Rehabilitation
Results
$7,082,991 est. value
Akron, OH 44308

Airfield Paving and Maintenance
Post-Bid
Wright Patterson Air Force Base, OH

Runway 28 Papi Replacement
Results
Less than $45,000 est. value
Lima, OH 45801

Type 2 Medium Asphalt
Post-Bid
Conneaut, OH 44030

Apron Rehabilitation
Results
Less than $167,365 est. value
Lima, OH 45801

Last Updated 10/05/2021 09:34 AM
Project Title

Rehabilitate Northeast and Southeast GA Aprons and Taxilanes

Physical Address View project details and contacts
City, State (County) North Canton, OH   (Stark County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,671,742
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project generally includes pavement rehabilitation including asphalt and concrete pavement reconstruction of the GA Aprons and Taxilanes. This work shall include the following: • Rehabilitation of the northeast GA Apron and Taxilanes, including milling and placement of asphalt pavement. Construction of full depth asphalt pavement in grass islands, including taxiway edge light relocation. • Reconstruction of the terminal apron concrete pavement. • Rehabilitation of the southeast GA Taxilanes, including full depth reconstruction of a portion of asphalt pavement. • Installation of new airfield taxiway edge lights adjacent to the southeast GA taxilanes.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents