Active Projects
Phase 1B - Segment D Pipeline
Infrastructure
Post-Bid
$3,000,000 est. value
Lockhart, TX
BCRUA Phase 2 Construction Materials Testing
Alteration
Post-Bid
Cedar Park, TX
Wolf Ditch Drainage Improvements
Infrastructure
Post-Bid
Killeen, TX 76541
Parkside on the River Phase 3, Section 3A and 3B
Parkside On the River Phase 2-1 and A Portion of Phase 2-2 Mud Masonry Wall
Water Oak North Section 6
Arias Geoprofessionals
Project Breakdown
Name | Title | Phone | Cell | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Ahmed N Ahsan | (512) | @.com | ||||||||
Alexandros Sioutis | (512) | @.com | ||||||||
Kyle Feldman | (512) | @.com |