Similar Projects
Air Conditioning and Quality Improvements Package 1 - 2022 Bond - Lansing School District
Alteration
Design
$4,100,000 est. value
Lansing, MI

Replace Cooling Tower, Piping and Associated Equipment - Romney Building
Alteration
Bidding
$200,000 est. value
Lansing, MI 48933

J.W.sexton High School 2022 Equipment Package - Bid Package 1
Alteration
Bidding
Lansing, MI 48915

East Lansing Public Library HVAC Upgrade and Site Improvements
Post-Bid
East Lansing, MI 48823

HVAC and Mechanical Products
Term Contract
Post-Bid

Beekman Center Condensing Unit Upgrade
Results
Lansing, MI 48910

Jan-Records Building-Replace North Ahus (1-4)
Results
Lansing, MI

J.W. Sexton High School 2022 HVAC Control Upgrades - Bid Package 2
Alteration
Bidding
$260,000 est. value
Lansing, MI 48915

Owen Graduate Hall - Implement Energy Conservation Measures
Post-Bid
East Lansing, MI

Bipolar Ionization System Installation
Results
East Lansing, MI

Connection To Chemistry To Retire Chillers 1 & 2
Post-Bid
Mason, MI

Abate and Pressurize Stairwells and Lobby Heating
Results
Lansing, MI 48933

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Replace HVAC System - Lottery Building
Results
Lansing, MI 48933

RTU Replacements
Alteration
Post-Bid
Lansing, MI 48910

Reported 06/21/2022 04:04 PM
Project Title

Air Conditioning and Quality Improvements Package 5 - 2022 Bond - Lansing School

Physical Address View project details and contacts
City, State (County) Lansing, MI 48933   (Ingham County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Schematic Drawings, Construction Start Expected October 2026
Bids Due View project details and contacts
Estimated Value $4,100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a mixed-use development in Lansing, Michigan. Design plans call for site work for a educational facility. Air conditioning and quality improvements for Post Oak and Attwood. As of June 17, 2022, this project is in the conceptual phase. The bond has been approved. Information regarding a design team and the contractor selection has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to November of 2026. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents